Toto EcoPower TET2GB Installation And Owner's Manual page 10

Flush valve for toilet
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION PROCEDURE — SMALL COVER
1. Determine the location of the
water supply pipe.
2. If necessary, slide a sweat
solder adapter on the water
supply pipe.
3. Attach the control stop to the
pipe.
4. Bore a guide hole for the flush
pipe into the wall.
NOTE: Thread sealing
compounds should be
used on the male NPT
threads only.
To use with a left water supply, detach
the controller and remount it to
opposite side of valve body.
Protect the wire connections
inside the controller's case.
5. Secure base frame to the wall with two screws.
Other base frame installation options with stringer
and for concrete wall on next page.
NOTE: Wall thickness must be 1/2" (13 mm)
minimum and 1-3/8"(35 mm)
maximum.
If your wall thickness is less than
1/2" (13 mm), please attach wooden
frame behind the wall.
Left water supply pipe
1" NPT (toilet)
** 3-11/16"
(94 mm)
4 x Ø5/16" (Ø8 mm) hole
Toilet top spud
Ø2-3/16" (Ø56 mm) hole
Toilet back spud
Ø2-3/16" (Ø55 mm) hole
* X", ‡ = At least 5" clearance from sensor to tip of toilet seat up position or
to top of grab bar is required to avoid false detection.
** Opening in wall
Detach
- 10 -
4-3/4" ± 1/2"
(120 ± 13 mm)
Right water supply pipe
1" NPT (toilet)
1-1/4" (31 mm)
CL of sensor
** 3-11/16"
(94 mm)
X"
Remount

Advertisement

Table of Contents
loading

Table of Contents