Toto EcoPower TET2GB Installation And Owner's Manual page 13

Flush valve for toilet
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION PROCEDURE — SMALL COVER
12. Connect the battery cable with the
controller and set the battery in place.
13. Attach the vandal proof screws to
the front cover using washers.
14. Connect the cables of infrared sensor
and controller with the connection cable.
15. Connect the cables of manual button
and controller with the connection cable.
NOTE: It will take 5 minutes after connecting
the battery for the electronics to
initialize.
After approximately 30 seconds, the
sensor LED will flash in 4 second
intervals until the initialization
completes.
16. Before the supply water is turned on, be
sure all water leaks are eliminated by
tightening all the pipe connections.
NOTE: If for any reason it becomes necessary to
remove the control stop, make sure the
water is shut off at the main supply valve.
17. Fasten the front cover to the base frame
by tightening the screws with the supplied
hex wrench.
18. Take care so that no cord, wire or chain
gets caught between the front cover and
the base frame.
Battery
Controller
Connection cable
Washer
Connection cable
(button)
Connection
cable
(sensor)
- 13 -
Screw
Hex wrench

Advertisement

Table of Contents
loading

Table of Contents