Download Print this page

Tiger SAMPI General Assembly Instructions page 5

Log cabin

Advertisement

BUILDING PACK CONTENTS:
For full details of what should be included please see the Product Construct Diagram and itemised cutting list
that is supplied with the delivery. They are also available on request in pdf form from our helpful Customer
Support team – please call 0113 205 4189 or use the Items Delivered Query form at tigersheds.com/contact.
ASSEMBLY
• Assembly is straightforward if you follow these step-by-step instructions.
• We recommend getting everything aligned properly before screwing together and that
screw holes should be pre-drilled to avoid splitting the timber. (Do not come pre-drilled).
IMPORTANT
• Before assembly, please make sure you have a suitable base ready to erect your building on.
• Your base MUST be firm and level to ensure that the building is assembled properly and is square.
• Please carefully remove the packaging and unpack the components in your delivery.
NOTE: ADDITIONAL TIMBER MAY BE INCLUDED AS PACKING MATERIALS.
• DO NOT start your build until you have checked that all the parts of your building are present and in a suitable condition.
• If you are organising a third party to install your building, it is best practice not to schedule this immediately on receipt of
your order, to give you time to check your delivery.
Please retain instructions for future reference
05

Advertisement

loading