Download Print this page

Tiger SAMPI General Assembly Instructions page 15

Log cabin

Advertisement

Step 9:
INSTALL PURLINS
• Purlins supplied as shown.
• Ensure notches in purlins line up with gable tops. Purlins to be
installed as shown.
(Detail G2)
• Secure the purlins into the gable tops using 2x N65
per purlin per gable top.
• Repeat for all purlin and gable top joins.
(Detail G1)
(Detail G3)
Please retain instructions for future reference
G1
G2
G3
N65
N65
15

Advertisement

loading