Final Assembly - Zoeller 132 Installation Instructions Manual

Drain pump system
Table of Contents

Advertisement

STEP 1
NOTE: This preassembled unit is designed for use with an
external trap.
Figure 1 is a typical configuration for installation of the drain
system. The actual configuration will vary depending on your
cabinet and sink configuration.
STEP 2
NOTE: External plumbing configu-
ration will vary depending on the
location of basin, location of main
stack and available space.
Place the basin assembly in its final
position and complete plumbing.
Secure all connections shown in
Figure 2.
STEP 3
1.
Plug the cord into a properly grounded GFCI receptacle.
2.
Fill the basin with 7.5 ~ 11 liters of water and let sit for 3 ~ 4
minutes to enable the environmentally safe peanuts to begin
dissolving.
3.
Slowly fill the basin with water.
4.
Check all plumbing for leaks as the basin fills.
5.
Verify that the pump starts and stops.
Determine Installation Configuration

Final Assembly

Glue on pipe thread
Initial Testing of Drain Basin System
© Copyright 2019 Zoeller Co. All rights reserved.
PIPING SHOWN ONLY
FOR CLARITY.
STANDARD INSTALLATION
Figure 2
6.
Check the discharge line for leaks as the pump empties the
basin.
7.
Repeat steps 2 through 6 as necessary to ensure proper
operation.
8.
If problems persist, refer to the troubleshooting guide
located on page 2 of this manual.
- 4 -
Figure 1
Glue on pipe thread
90° Elbow
or
EA0032
SK2001

Advertisement

Table of Contents
loading

Table of Contents