1.2
1.3
1.3.1
Introduction to the installation and
commissioning manual
About the installation and commissioning manual
The installation and commissioning manual contains the following chapters:
• The chapter "Safety information" presents warning and note signs, which the user
should draw attention to.
• The chapter "Overview" gives an overview over the major task when installing and
commissioning the terminal.
• The chapter "Unpacking and checking the terminal" contains instructions on how
to receive the terminal.
• The chapter "Installing the terminal" contains instructions on how to install the ter-
minal.
• The chapter "Checking the external circuitry" contains instructions on how to check
that the terminal is properly connected to the protection system.
• The chapter "Energising the terminal" contains instructions on how to start-up the
terminal.
• The chapter "Configuring the digital communication modules" contains instruc-
tions on how to configure the communication modules such as modems, optical con-
verters etc if included in the terminal.
• The chapter "Setting and configuring the terminal" contains instructions on how to
download settings and configuration to the terminal.
• The chapter "Establishing connection and verifying the SPA/IEC-communication"
contains instructions on how to enter SPA/IEC settings and verifying the SPA/IEC
communication.
• The chapter "Verifying settings by secondary injection" contains instructions on
how to verify that each included function operates correctly according to the set val-
ue.
• The chapter "Verifying the internal configuration" contains instructions on how
verify that the terminal is properly configured.
• The chapter "Testing the protection system" contains instructions on how to test that
the terminal is in contact with the primary system.
• The chapter "Checking the directionality" contains instructions on how to test di-
rectional dependent functions, if included in the terminal.
Intended audience
General
The installation and commissioning manual is addressing the installation, commission-
ing and maintenance personnel responsible for taking the protection into normal service
and out of service.
Chapter 1
Introduction
3