R-8464
Removable Bollard Installation
Parts List
#
PART
1
Removable Bollard
2
Receiver
3
Receiver Cover
4
Key
5
Reflective Tape (optional)
Installation Equipment
Auger
Dirt Tamper
Measuring Tape
4
5
1
3
2
QTY
1
1
1
2
1
Chalk/Marker
Level
1-877-789-3245 | info@reliance-foundry.com | www.reliance-foundry.com
Removable Bollard
To protect the finish, keep bollards in original
packaging until exact moment of installation.
Handle with care to avoid scratching or
damaging bollard surfaces.
Once scratched, bollards cannot be repaired
to original form without re-finishing the entire
surface.
Consider local soil conditions before proceeding
with bollard installation.
Before Installation
STEP 1: Study the site plans and mark the intended
location of each bollard on the plan.
STEP 2: Always check for hazards such as water pipes,
gas lines, and underground wiring before digging.
STEP 3: Please consult your local Building Code
Department to determine the recommended depth
below the frost line for digging in your area. Choose a
minimum of this or 6-3/4", whichever is greater. Then
add a minimum of 6" for holding the drain rock.* This is
the total depth. The diameter of the hole should extend
to a minimum of 12".
6 3/4" min
6" min
* Recommended depth for drain rock is a minimum of 6". Depth
will also depend on local soil conditions, weather conditions, and
engineering requirements.
R-8464
12
" min
Need help?
Do you have a question about the R-8464 and is the answer not in the manual?
Questions and answers