Installation And Power Supply Facility; Power Supply And Connecting Cable; Grounding - Panasonic YC-400TX4 Operating Instructions Manual

Digital igbt controlled dctig arc welding power source
Table of Contents

Advertisement

3
Instal
lation a
3.
1 Power
supply a
Item
m
Supply volta
phases
F
Facility capa
Switch bo
ox
brea
Input cable
Output cable
N.B
B.
1)
Turn off the
e switch of th
a s
specified fus
se.
2)
Power supp
ply cable sho
3)
If an engine
e generator i
tha
at ofthe weld
der or with c
3.
2 Ground
ding
. Protection
against ele
electric sh
hocks and m
welder co
ontroller.
Dailycheckin
ng of groun
disconnec
cted orbroke
turned off
f beforereco
and Pow
wer sup
and conn
necting c
Type
age
V
city
kVA
Fuse
A
Ea
arth leakage
A
aker or no-fus
se
breaker
e
mm2
e
mm2
he switch bo
oxwhile conn
2
ould be 14 m
mm
or more
is used, it sh
hould be pro
compensatin
ng winding fo
ectric shock
k caused by
malfunctioni
ing of equip
nding condu
uctor perform
en. If it is dis
sconnected,
nnecting.
pply faci
ility
cable
YC-4
00TX4HGH
A
AC 380
Thr
ree-phase
30
0 or more
40
50
6
or more
50
0 or more
necting cable
e. Provide a
e in sectiona
alarea if its le
ovided witha
an inverter o
or thyristoreq
quipment.
y degraded
insulationof
pment cause
ed by high f
mdaily chec
ck ofground
or broken,
reconnect it
2
YC-4
400TX4HJE
AC415
Th
ree-phase
20
0 or more
40
50
6 or more
6
50
0 or more
a switch box
for every w
ength is mo
re than 10 m
f capacity fr
rom three to
f welder Gr
round the ca
frequency w
wavesgenera
ding conduc
ctor. Confirm
t. Theswitch
of the switc
elder and us
se
m.
five times o
of
ase to prev
vent
ated from in
nert
m whether it
t is
ch box must
t be

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents