2 Installation

In order to avoid personal accidents during operation, please wear proper protective gloves, safety
shoes, long sleeve clothing and other protective equipment.

2.1 Installation and operation site

● In order to ensure the safety of the operator and maintain the performance of the product, please set it in the
site meeting the following conditions.
● This machine is for indoor use,and its enclosure protection class is IP21S,not suitable for storage and use in
rain or snow
● If the liquid cooling system needs to be placed on an inclined plane, anti overturning measures should be taken.
Note:
● Fuse shall be set in the input protection (distribution box) equipped with each liquid cooling system, and the
fuse with AC 500V or above shall be used. The recommended fuse capacity is 6A.
2.2 Handing and tansport
● In case of transferring the unit on the floor
Note:
In order to avoid damaging the fixed foot, it is better to replace the mobile caster before moving the device.
(Mobile casters are optional)
Transfering the unit with the coolant water in the tank may cause the coolant water to
trickle out of the tank, which may lead to short circuit or rusting.
Prior to transferring the unit, either empty the coolant water in the tank or remove the tank
from the unit.
● In case of mounting on our welding power source
It is necessary to use a fixing bracket unit (separate sales),Specific information can be consulted with local
agents or contact the company.
No.
Installation and operation site
1
Free from direct sunlight, rain or water spray.
2
Locate indoor with less humidity and dust.
3
ambient temperature range from -10
Maintain an appropriate distance of 20 cm or more from
4
any wall or other devices.
5
Free from abnormal vibration or impact.
Free
from
generation
6
harmful corrosive gas.
7
Horizontal place. ,The inclination angle is less than 10 °
Empty the coolant in the tank before transferring the unit.
to 40
of
oily
vapor
4
or
any