-operation check
●
Pre
Check if all connections are correct andcomplete.
•
Check if settings of the switches on the P.C. Board are correct
•
Check if wire is set to the wirefeeder.
•
●
on power
Turning
Turn off the power to the distributionbox.
•
Turn on the power switch of thisproduct.
•
5.7 Termination processing (steps after welding operation)
●
Shutting off gas
Close the main valve of the gasbottle.
•
Perform the "gas purge" to take the residual pressure out of thepipe.
•
●
Shutting off power
Important
Turn off "POWER" switch.
•
Turn off the power to the distribution box.
•
To allow the inside of this product to cool down, turn the power off at least 5
minutes after the completion of welding operations.
14