Load Management; Dynamic Load Management; External Control; Maintenance / Preventive Maintenance Instructions - LEGRAND 0 570 10 User Manual

Ev charging station
Hide thumbs Also See for 0 570 10:
Table of Contents

Advertisement

Available languages

Available languages

8. Load Management

8.1. Dynamic Load Management

You can use this feature if a compatible energy meter is connected to your charging station and to your prop-
erty's electrical supply.
The energy meter measures the total power consumption in your property. If some other load over the set
maximum current for load management is added when charging is ongoing, the charging station will decrease
the charging current. If the total power consumption reaches the allowed maximum power of your property,
the charging interrupts until the total power consumption has decreased to a value at which the charging can
continue.
You can see the real time charging current from the Charger Control Application.
You can enable / disable this feature from the Charger Control Application.

8.2. External Control

You can use this feature if an external control device is connected to your charging station. The override func-
tion depends on the connected devices. It can be for example a load management system for your entire
property or a switch or a timer that controls your charging station.
Please study the user instructions for the connected devices.
You can enable / disable this feature from the Charger Control Application.

9. Maintenance / Preventive Maintenance Instructions

Do these maintenance actions once a year or as necessary. With well-done maintenance you can ensure a
long lifetime of the charging station and keep the warranty valid.
X
Maintenance action
Clean possible dirt and dust from the surface of the charging station. Wipe carefully with a moist cloth.
Examine the charging plug and the charging cable for wear out or mechanical damage.
The charging plug and cable must only be replaced by a qualified professional.
Software update, if necessary. The software update takes at least 15 - 20 minutes.
Do not switch off the power or use the charging station during the update.
Test the residual current device. Comply local requirements for testing interval, but test the device at
least once every six months.

10. Residual Current Device Testing Instructions

0 570 10 / 0 570 12 / 0 570 14 / 0 570 16:
Test the residual current device at the supply line.
0 570 11 / 0 570 13 / 0 570 15 / 0 570 17:
The combined device with residual current circuit breaker and over current protection (RCBO) is located
in the installation box.
Open the installation box hatch.
Press the TEST button.
The rocker turns to 0 position.
Turn the rocker back to I position.
If a fault occurs, contact an electrician.
14 / 28
LERAK135B_20221004

Advertisement

Table of Contents
loading

Table of Contents