Section 15. Checkout Procedures

15.1 Operational And Checkout Procedures
Final phases of this installation are the unit Operational and Checkout Procedures. To obtain proper performance, all units
must be operated and charge adjustments made.
Important: Perform a final unit inspection to be sure that factory tubing has not shifted during shipment. Adjust tubing if nec-
essary so tubes do not rub against each other when the unit runs. Also be sure that wiring connections are tight and properly
secured.
After installation has been completed, it is recommended that the entire system be checked against the following list:
1. Leak check refrigerant lines. ........................................ [ ]
2. Properly insulate suction lines and fittings. ................... [ ]
3. Properly secure and isolate all refrigerant lines. ........... [ ]
4. Seal passages through masonry.
If mortar is used, prevent mortar from coming
into direct contact with copper tubing. .......................... [ ]
5. Verify that all electrical connections are tight. ............... [ ]
6. Observe outdoor fan during on cycle for clearance
and smooth operation. .................................................. [ ]
15.2 Markings and Instructions
UV
Refrigerant
class per
18-AC127D1-1A-EN
CHECKOUT PROCEDURE
[symbol ISO 7010-W021 (2011-05)]
[symbol ISO 7000-1659 (2004-01)]
[symbol ISO 7000-1701 (2004-01)]
[symbol IEC 60417-6040 2010-08)]
[symbol ISO 7000-1641 (2004-01)]
ISO 817
7. Be sure that indoor coil drain line drains freely. Pour water
into drain pan. ............................................................... [ ]
8. Be sure that supply registers and return grilles are open
and unobstructed. ......................................................... [ ]
9. Be sure that a return air filter is installed. ..................... [ ]
10. Be sure that the correct airflow setting is used.
(Indoor blower motor) ................................................... [ ]
11. Operate complete system in each mode to
ensure safe operation. .................................................. [ ]
A2L symbol
warning; flammable materials
service indicator; read technical
manual
warning; low burning velocity material
pressure
ultraviolet radiation,
instructional safeguard
operator's manual; operating
instructions
19

Advertisement

Table of Contents
loading

Table of Contents