Cisco Catalyst IW9167E Hardware Installation Manual page 46

Heavy duty access point
Table of Contents

Advertisement

Connecting to the DC Power Port Using Cable Gland
SUMMARY STEPS
1. Disassemble PG13 cable gland and slide parts over DC cable in the order shown in the following figure:
2. Plug 4P connector cable into the DC connector in the chassis.
3. Thread the PG13 body (with gasket) into the chassis.
4. Insert the grommet into the ferrule, and press it into the PG13 body.
5. Tighten the clamp nut onto the PG13 body until the grommet compresses onto the DC cable.
DETAILED STEPS
Step 1
Disassemble PG13 cable gland and slide parts over DC cable in the order shown in the following figure:
1
DC cable
2
Gasket
3
PG13 body
Step 2
Plug 4P connector cable into the DC connector in the chassis.
Step 3
Thread the PG13 body (with gasket) into the chassis.
Step 4
Insert the grommet into the ferrule, and press it into the PG13 body.
Step 5
Tighten the clamp nut onto the PG13 body until the grommet compresses onto the DC cable.
Cisco Catalyst IW9167E Heavy Duty Access Point Hardware Installation Guide
38
4
Grommet
5
Ferrule
6
Clamp nut
Installation Overview

Advertisement

Table of Contents
loading

Table of Contents