Introduction - Ingeteam Sun Storage 1Play TL M Use And Settings

Hide thumbs Also See for Sun Storage 1Play TL M:
Table of Contents

Advertisement

Available languages

Available languages

Ingeteam

1 INTRODUCTION

This document describes the process to connect and configure INGECON SUN STORAGE
1Play TL M (ISS 1Play TL M) to work with the battery B3/B4850/A48100/POWERBOX of
DYNESS.
Ingecon Sun Storage 1Play TL M
The ISS 1Play and the battery B3/B4850/A48100/POWERBOX equipment can be used in the
following type of installations:
Stand-alone installations
UPS installations
Self-consumption installations
The minimum version of the ISS 1Play TL M to work with the B3/B4850/A48100/POWERBOX:
Minimum Firmware Version for the ISS 1Play TL M:
Inverter: ABH1007_J
ABH2010IMC26_.docx
Use and settings of the INGECON SUN STORAGE 1Play TL M working with
B3/B4850/A48100/POWERBOX of DYNESS
DYNESS B4850
11

Advertisement

Chapters

Table of Contents
loading

Table of Contents