Download Print this page

Bison PKG46STRG Instruction Manual page 3

Advertisement

3.
Mark the center line of the court on the wall. Fasten the 3 Wall Boards (B) to the wall at the heights
indicated in Figure 1 and centered with the center line of the court. Drill holes in Wall Boards (B)
according to position and type of wall anchor chosen. Anchor each Wall Board (B) in no less then
four places. If the wall is masonry (Brick over block), block, or poured concrete and it's possible to
drill through the wall and you have access to the other side of the wall it is strongly recommended
that the installer bolts through the wall using 1/2" bolts.
Severe injury to players or fans may result from failure to select a proper anchoring system given
the construction and condition of the wall or the improper use of the proper anchoring system.
Bison model BA950LR AutoLoc Structure Catch is recommended
4.
Attach a Chain Connector (S) and a 3/16" Proof Chain (D) to each Chain Eye Bracket (C).
See Figure 3.
Warning!
Note:
especially for systems installed over bleachers.
3
Figure 3

Advertisement

loading

This manual is also suitable for:

Pkg68strgPkg82strg