Huawei iSitePower-M MAP05A1 Quick Manual page 28

Hide thumbs Also See for iSitePower-M MAP05A1:
Table of Contents

Advertisement

Subsequent Operations
8.3
1. Close and lock the maintenance compartment door.
2. To facilitate cabling, cut off part of the decorative cover as required.
Left decorative
cover
3. Route the cables out of the cable holes.
Right decorative cover
27
The outlet positions
shown in the figure are
for reference only. Select
an appropriate cable
outlet based on the
actual cable thickness.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m mab05b1

Table of Contents