4. Install the remaining battery modules and power module from bottom to top. Each time a
module is installed, tighten the screws on the left and right, and then secure it against the wall.
Ground mounting
5. Open the power module maintenance compartment and set the DIP switch address.
Scenario
Single product
Master
Parallel
Slave 1
products
Slave 2
DIP Switch
Pin 1(M/S)
Address
1
ON
1
ON
2
OFF
3
OFF
Pin 2 (A)
OFF
OFF
ON
OFF
10
Wall mounting
Pin 3 (B)
Pin 4 (C)
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF