CONFIGURATION & COMMISSIONING
COMMUNICATION INFORMATION
This section contains settings which control how the QWL
3 .1 Rev 3 Series Panel connects out through the LAN or
WAN to the Internet . All of these settings are determined
by the local network administrator or IT department. The
correct settings, network permissions, and port openings
(ports 80 and/or 443) need to be verified prior to installa-
tion and connecting to the local network .
Communications Options: The QWL 3 .1 Rev 3 Series Pan-
el supports both static IP and Dynamic Host Configuration
Protocol (DHCP) IP address allocations. Enter the central
server Location, typically www.ubiquitysystems.net by click-
ing the "Set Ubiquity Domain Name" button. There are a few
special options which can be enabled: TCP window scaling,
IPV6 and Secure Sockets Layer (SSL requires port 443 to
be open), select whether to enable or disable these special
options. Enter host name if needed (typically left blank).
Network: Select the desired IP allocation (DHCP or static
IP addressing) to be used. When using static IP, it is neces-
sary to enter the IP Address, Gateway, Subnet, DNS1 and
DNS2 settings Virtual IP can be used (typically left blank).
The IP settings will need to be established by the LAN/WAN
network administrator prior to installation . When utilizing
DHCP addressing, the IP address settings are automatically
assigned when communication is established.
Proxy: If a proxy is required, select Static Proxy from the
drop-downy and enter all the related details in the fields
that appear . Once you are finished entering information in
this section, click the Update Commissioning Info button.
SECURITY INFORMATION
This section contains settings which control the security
of the gateway within the QWL 3 .1 Rev 3 Series Panel and
whether or not it can be accessed through the web inter-
face. Enabling Secure Mode disables all web interfaces
including the configuration page, and requires a specially
6
2800 Laura Lane • Madison, WI 53562 | 800.288.9383 • fax: 608.836.9044 | www.tcsbasys.com
configured USB flash drive or TCS Technical Support ac-
cess to the QWL Panel if it is online with the Ubiquity Cloud
central server to "unlock" it .
Here is where you change the default login credentials
used to access the Configuration Page . It is recommend to
change these login credentials .
Once you are finished entering information in this section,
click the Update Security Info button.

Commissioning Tools

A separate page which contains various commissioning
tools can be accessed by clicking the "Commissioning
Tools" button at the bottom of the Setup page. This page
gives you access to additional information about the con-
nection status of the QWL 3 .1 Rev 3 Series Panel and the
controller network connected to it .
UBIQUITY CLOUD CONNECTION STATUS
This section displays the status of the connection between
the QWL 3 .1 Rev 3 Series Panel and the central server . You
have 3 options for the message that will appear here:
1) Error - No Route to Host -- means the unit does not cur-
rently have an Ethernet connection .
2) Connected -- means the unit is able to communicate to
the Ubiquity Cloud central server BUT is not being matched
up with a specific Site, typically this indicates that the site
is not initialized on the central server side yet, please con-
tact TCS Basys Controls to assign or initialize the QWL 3 .1
Rev 3 Series Panel to a site .
3) Established -- means the unit is communicating with
the Ubiquity Cloud central server AND is ready to go. All
Ubiquity Cloud functions (monitoring, programming, alarm-
ing, etc.) should be available through the user interface at
this point .