Mounting; Wiring - TCS QWL 3.1 Rev 3 Product Manual

Integrated building manager panel
Table of Contents

Advertisement

MOUNTING & WIRING

Mounting

The QWL 3 .1 Rev 3 Series Panel is designed for mounting us-
ing four #10 pan head screws. When drilling, ensure that the
QWL 3 .1 Rev 3 Series Panel is powered down and all metal
shavings are captured .

Wiring

The QWL 3 .1 Rev 3 Series Panel terminal designations are
shown below.
QWL 3.1 REV 3 SERIES PANEL WIRING
3
2800 Laura Lane • Madison, WI 53562 | 800.288.9383 • fax: 608.836.9044 | www.tcsbasys.com
DI8 DI7
DI6 DI5
DI4 DI3
DI2 DI1
Main Board
QWL 3.1 REV 3 SERIES PANEL LAYOUT
INPUT WIRING
The QWL 3 .1 Rev 3 Series Panel accepts two 0 to 5 VDC
inputs, 8 dry contact/digital inputs and 4 pulse meter
inputs .
POWERING THE QWL 3.1 REV 3 SERIES PANEL
The QWL 3 .1 Rev 3 Series Panel is powered from a
120VAC @ 60HZ to 12VDC power supply module (includ-
ed) . The QWL 3 .1 Rev 3 Series Panel is designed to con-
tain 24 VAC devices and wiring ONLY . No line voltage (120
VAC or greater) is to be installed within this panel.
NOTE:
If drilling, the QWL
3.1 Rev 3 Series
Panel must be
powered down and
metal shavings
must be contained.
See RS-485 controller
network wiring diagram .
Main Board
1" EMT Knockout for use
with ¾" Conduit

Advertisement

Table of Contents
loading

Table of Contents