Integrated building manager panel

Advertisement

Quick Links

QWL 3.1 Rev 3
Integrated Building Manager Panel
2800 Laura Lane • Madison, WI 53562 | 800.836.9044 • fax: 608.836.9044 | www.tcsbasys.com
|
PRODUCT MANUAL
The QWL 3.1 Rev 3 Integrated Building
Manager Panel contains a Ubiquity Cloud™
Site Gateway w/ integrated lighting and
energy management controls.
Rev:0617

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QWL 3.1 Rev 3 and is the answer not in the manual?

Questions and answers

Summary of Contents for TCS QWL 3.1 Rev 3

  • Page 1 PRODUCT MANUAL QWL 3.1 Rev 3 The QWL 3.1 Rev 3 Integrated Building Manager Panel contains a Ubiquity Cloud™ Site Gateway w/ integrated lighting and energy management controls. Integrated Building Manager Panel Rev:0617 2800 Laura Lane • Madison, WI 53562 | 800.836.9044 • fax: 608.836.9044 | www.tcsbasys.com...
  • Page 2: Table Of Contents

    TCS ZigBee Wireless Network . . . . . . . . . . . . . . . . . .
  • Page 3: Mounting

    . QWL 3 .1 Rev 3 Series Panel is powered down and all metal shavings are captured . POWERING THE QWL 3.1 REV 3 SERIES PANEL The QWL 3 .1 Rev 3 Series Panel is powered from a Wiring 120VAC @ 60HZ to 12VDC power supply module (includ- The QWL 3 .1 Rev 3 Series Panel terminal designations are...
  • Page 4: Rs-485 Controller Network Wiring

    “A” and cation address from 0 to 255, excluding 248. On controllers “B” wires. If the QWL 3.1 Rev 3 Series Panel will be at one with displays, this is accomplished using the keypad and end of the network, hard wire a 120 Ω...
  • Page 5: Gateway Configuration Page

    Site Time. The Site Time is used by the local net- work and the QWL 3.1 Rev 3 Series Panel until the Ubiquity Cloud central server performs a time synchronization with the site .
  • Page 6: Commissioning Tools

    DNS2 settings Virtual IP can be used (typically left blank). tact TCS Basys Controls to assign or initialize the QWL 3 .1 The IP settings will need to be established by the LAN/WAN Rev 3 Series Panel to a site .
  • Page 7: Programming - Lighting Module

    COMISSIONING & PROGRAMMING Programming - Lighting Module The lighting module portion of this panel is an SLQ218. It must be programed using TCS Insight or Ubiquity Cloud. CHANNEL EVENT SCHEDULING There are eight independent channels each with its own schedule. If the occupied or “ON” time for a particular day is from 8:00AM to 5:00PM.
  • Page 8 External Override mode: The digital input acts the same as section) to shut off lighting channels, select the relevant the override button on the front of the QWL 3.1 Rev 3 Series 2800 Laura Lane • Madison, WI 53562 | 800.288.9383 • fax: 608.836.9044 | www.tcsbasys.com...
  • Page 9 COMISSIONING & PROGRAMMING Panel. The switch used for this type of digital input must be a momentary N .O . switch . Momentary Override: The digital input acts like a toggle switch. This must also be a momentary N.O. switch. If the time clock is on, pressing the switch turns it off, If the time clock is off, pressing the switch turns it on.
  • Page 10: Programming - Pulse Meter

    COMISSIONING & PROGRAMMING factor is 4 .4 If the line voltage is 277 VAC and the SLQ218 a single count. A pulse output can be either a mechanical power input is 24 VAC, then the calibration factor is 11.5. relay or solid state device . The pulse output corresponds to a unit/time of a monitored quantity.
  • Page 11: Tcs Zigbee Wireless Network

    (PulseCount*CTValue*MtrConst*MtrMult) • The reset button in the lower right hand corner is used Consumption = to “reboot” the entire QWL 3.1 Rev 3 Series Panel. This is accomplished by pushing and holding the button for (PPRValue*PulseTimeDiff) 5-7 seconds . Note: During a reboot, the lights associated with the...
  • Page 12 CHECKOUT & TROUBLESHOOTING • Place the appropriate (Normally Open) NO or (Normally Closed) NC jumpers (both included) in position-RED wires = NO-ON=Closed and BLACK wires=NC-On=Open Utility Meter Pulse Transducer Module - SEQ100 • Verify all wiring prior to powering the QWL 3.1 Rev 3 Series Panel and SEQ100.