Preparation And Use - ElectroSteam IND00105 Use And Maintenance Manual

Steam generator - 10 kw
Table of Contents

Advertisement

Available languages

Available languages

5

- PREPARATION AND USE

CONTROLS AND MAIN PARTS
1 -
General switch
2 -
Pressure gauge
3 -
General switch signal lamp
4 -
No-water signal lamp and
water-fi lling signal lamp
5 -
Temperature indicator /
thermoregulator
6 -
Vapor delivery control
switch
7 -
General switch for pump-
heater feeding.
8 -
Vapor Delivery Regulator
9 -
Flexible hose socket
10- Protection
11- Hour counter
PREPARATION
Insert the plug into an appro-
priate electrical system's soc-
ket. Unless otherwise indicated,
the machine is requires a THREE-
PHASE 400V- 50Hz connection
(Fig. 3).
It is recommended that the
electric supply to this appliance
should include either a residual
current device that will interrupt
the supply if the leakage current
to earth exceeds 30 mA for 30
ms or a device that will prove
the earth circuit.
Note: We decline any responsibi-
lity for damage caused by ope-
ration with voltage values not
compliant with those indicated!
Turn on the machine by acting
on the general switch located
below of the control panel
(Fig. 3).
English
Fig. 3
28
Fig. 2

Advertisement

Chapters

Table of Contents
loading

Table of Contents