SunSynk -8K-SG01LP1 User Manual

SunSynk -8K-SG01LP1 User Manual

Hybrid paritym (super) inverter
Hide thumbs Also See for SUNSYNK-8K-SG01LP1:
Table of Contents

Advertisement

HYBRID PARITY
(SUPER) INVERTER
USER MANUAL
SUNSYNK-8K-SG01LP1 / SUNSYNK-8K-SG03LP1
Global Tech China Ltd, 3 Floor, Wai Yip Industrial Building.
171 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong.
Tel: +852 2884 4318 Fax: +8522884 4816
www.sunsynk.com / sales@sunsynk.com
v.17 (11/10/22)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SUNSYNK-8K-SG01LP1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SunSynk SUNSYNK-8K-SG01LP1

  • Page 1 HYBRID PARITY (SUPER) INVERTER USER MANUAL SUNSYNK-8K-SG01LP1 / SUNSYNK-8K-SG03LP1 Global Tech China Ltd, 3 Floor, Wai Yip Industrial Building. 171 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. Tel: +852 2884 4318 Fax: +8522884 4816 www.sunsynk.com / sales@sunsynk.com v.17 (11/10/22)
  • Page 2: Table Of Contents

    Table of Contents SAFETY 1.  1.1. General Safety 1.2. Symbols 1.3. Safety Instructions 1.4. Disposal Remarks 2. PRODUCT INTRODUCTION 2.1. Product Size 2.2. Basic System Architecture 3. TECHNICAL SPECIFICATIONS 4. INSTALLATION 4.1. Parts List 4.2. Selecting the Mounting Area 4.3. System Diagram 4.4. Mounting the Inverter 4.5. Function Port Definition 4.6. Battery Connection 4.6.1. Recommended DC Battery Protection 4.7. Connecting a Lithium Battery 4.8. Battery Temperature Sensor Connection 4.9. Connecting the AC...
  • Page 3 4.18. Split-Phase (120/240Vac) Parallel Connection Diagram 4.19. Three-Phase (230/400Vac) Parallel Connection 4.20. Three-Phase (120/208Vac) Parallel Connection 4.20.1. Connected to the Grid 4.20.2. Connected to a Generator 4.21. Three-Phase (120/208Vac) PCs Parallel Connection 5. OPERATION 5.1. Display 5.2. Switching ON/OFF 5.3. Home Page 5.4. Status Page 5.5. System Flow Page 5.6. Setup Page 5.7. Set Time (Clock) 5.8. Set Company Name / Beeper / Auto dim 5.9. Factory Reset and Lock Code 5.10. Battery Setup Page...
  • Page 4 APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E HYBRID INVERTER | Installer Manual...
  • Page 5: Safety

    1. SAFETY 1.1. General Safety This device should only be used in accordance with the instructions within this manual and in ƒ compliance with local, regional, and national laws and regulations. Only allow this device to be installed, operated, maintained, and repaired by other person(s) who have read and understood this manual. Ensure the manual is included with this device should it be passed to a third party.
  • Page 6: Safety Instructions

    1.3. Safety Instructions WARNING HIGH LIFE RISK DUE TO FIRE OR ELECTROCUTION. Sunsynk Single-Phase Hybrid Inverter can only be installed by a qualified licensed electrical contrac- tor. This is not a DIY product. Be sure to read this manual thoroughly before installation.
  • Page 7: Product Introduction

    2. PRODUCT INTRODUCTION The Sunsynk Single-Phase Hybrid Inverter is a highly efficient power management tool that allows the user to hit those ‘parity’ targets by managing power-flow from multiple sources such as solar, mains power (grid), and generators, and then effectively storing and releasing power as and when utilities require.
  • Page 8 1. Inverter Indicators 7. CAN Port 13. Grid 2. LCD Display 8. Battery input connectors 14. Generator input 3. Function Buttons 9. Function Port 15. Load 4. DC Switch 10. Meter_CON port 16. WiFi Interface 5. Power on/off button 11. Parallel port 6.
  • Page 9: Product Size

    2.1. Product Size Inverter Size HYBRID INVERTER | Installer Manual...
  • Page 10: Basic System Architecture

    2.2. Basic System Architecture The following illustration shows the basic application of this inverter. It also includes the following devices to have a Complete running system. ƒ Generator or Utility ƒ PV modules ƒ Consult with your system integrator for other possible system architectures depending on your require- ƒ...
  • Page 11: Technical Specifications

    3. TECHNICAL SPECIFICATIONS Model SUNSYNK-8K-SG01LP1 / SUNSYNK-8K-SG03LP1 Product Type Hybrid Inverter Enclosure IP65 Ambient Temperature -45ºC ~ 60ºC (>45ºC derating) Protection Level Class I Charge Mode Battery Voltage 48Vd.c (40Vd.c ~ 60Vd.c) Battery Current 190Ad.c (max.) AC Input Voltage L/N/PE 220/230Va.c...
  • Page 12: Installation

    4. INSTALLATION 4.1. Parts List Check the equipment before installation. Please make sure nothing is damaged in the package. You should have received the items in the following package: HYBRID INVERTER | Installer Manual...
  • Page 13: Selecting The Mounting Area

    4.2. Selecting the Mounting Area DO NOT install the inverter in the following areas: Areas with high salt content, such as the marine environment. It will deteriorate the metal parts and pos- ƒ sibly lead to water/dampness penetrating the unit. Areas filled with mineral oil or containing splashed oil or steam, such as those found in kitchens. It will ƒ...
  • Page 14: Mounting The Inverter

    Install the indoor unit on the wall where the floor height is higher than 1600mm. ƒ For proper heat dissipation, allow a clearance of approximately 500mm to the side, 500mm above and ƒ below the unit, and 1000mm to the front of the unit. 4.4. Mounting the Inverter Select installation locations that are adequate to support the weight of the converter.
  • Page 15 Choose the recommended drill head(as shown below) to drill 4 holes on the wall, 52-60mm deep. Use a proper hammer to fit the expansion bolt into the holes. ƒ Carry the inverter and hold it, ensure the hanger aims at the expansion bolt, and fix the inverter on the ƒ...
  • Page 16: Function Port Definition

    4.5. Function Port Definition HYBRID INVERTER | Installer Manual...
  • Page 17: Battery Connection

    4.6. Battery Connection For safe operation and compliance, a separate DC over-current protector or disconnect device is required between the battery and the inverter. Switching devices may not be required in some applications, but over-current protectors are still required. Refer to the typical amperage in the table below for the required fuse or circuit breaker size.
  • Page 18: Recommended Dc Battery Protection

    4.6.1. Recommended DC Battery Protection Inverter DC Isolator Fuses Two Pole 4.7. Connecting a Lithium Battery When connecting a Lithium battery, follow the connection steps below and check ‘Setting up a Lithium Bat- tery’ to connect with an inverter. 1. Connect the correct cable diameter following the battery manufacture specifications and recommended safety devices.
  • Page 19: Battery Temperature Sensor Connection

    PLEASE NOTE When connecting more than one battery, ensure they are set in the configuration of ‘master and slave’. 4.8. Battery Temperature Sensor Connection Without a remote temperature sensor, lead-acid batteries may undercharge or overcharge depending on the ambient temperature of the installation environment. This may result in a fire hazard. PLEASE NOTE Depending on the battery type, the inverter should be capable of controlling the batteries BMS.
  • Page 20 HYBRID INVERTER | Installer Manual...
  • Page 21: Connecting The Ac

    4.9. Connecting the AC Before connecting to the grid, please install a separate AC breaker between the inverter and the grid. Also, it is recommended that installs an AC breaker between the backup load and inverter. This will ensure that the inverter can be securely disconnected during maintenance and fully protected from overcurrent. For the 8KW model, the recommended AC breaker for backup load is 63A.
  • Page 22: Recommended Ac Surge Protector

    4.9.1. Recommended AC Surge Protector HYBRID INVERTER | Installer Manual...
  • Page 23: Installing The Ct Coil

    4.10. Installing the CT Coil The CT coil is one of the most important parts of the Sunsynk Parity inverter. This device reduces the power of the inverter to prevent feeding power to the grid. This feature is also known as “Zero Export”.
  • Page 24 If the CT coil is fitted in the wrong way then this variable will have negative instead of positive values when the power is flowing into the house/inverter. Also, the inverter export limiting function will not work properly. HYBRID INVERTER | Installer Manual...
  • Page 25: Earth Connection (Mandatory)

    Since the inverter is a true hybrid, then the bond must only be made when the inverter is operating in Island- ing Mode. To accommodate this, Sunsynk provides an AC output, which is connected to the A/T/S connec- tions whenever the inverter is running on Island Mode. Therefore, you can simply connect the coil of an AC relay to the ATS 240 connections.
  • Page 26: Meter Connection

    4.12. Meter Connection 4.12.1. System Connection for the CHNT Meter - EU 4.12.2. System Connection for the CHNT Meter - US HYBRID INVERTER | Installer Manual...
  • Page 27: Wiring System For Inverter

    4.13. Wiring System for Inverter HYBRID INVERTER | Installer Manual...
  • Page 28 HYBRID INVERTER | Installer Manual...
  • Page 29: Pv Connection

    4.14. PV Connection Before connecting to PV panels, install a separate DC circuit breaker between the inverter and PV modules. In addition, we request users install PV junction boxes with surge protection to protect the system from a lightning strike. To avoid any malfunction, do not connect any PV modules with possible current leakage to the inverter. For example, grounded PV modules will cause current leakage to the inverter.
  • Page 30: Pv Protection

    4. Finally, insert the DC connector into the positive and negative input of the inverter. 4.15. PV Protection Protection contre les surtensions solaires et fusible 4.16. Typical Application Diagram of Diesel Generator HYBRID INVERTER | Installer Manual...
  • Page 31: Single-Phase (230Vac) Parallel Connection Diagram

    4.17. Single-Phase (230Vac) Parallel Connection Diagram HYBRID INVERTER | Installer Manual...
  • Page 32: Split-Phase (120/240Vac) Parallel Connection Diagram

    4.18. Split-Phase (120/240Vac) Parallel Connection Diagram HYBRID INVERTER | Installer Manual...
  • Page 33 HYBRID INVERTER | Installer Manual...
  • Page 34: Three-Phase (230/400Vac) Parallel Connection

    4.19. Three-Phase (230/400Vac) Parallel Connection HYBRID INVERTER | Installer Manual...
  • Page 35: Three-Phase (120/208Vac) Parallel Connection

    4.20. Three-Phase (120/208Vac) Parallel Connection 4.20.1. Connected to the Grid HYBRID INVERTER | Installer Manual...
  • Page 36: Connected To A Generator

    4.20.2. Connected to a Generator HYBRID INVERTER | Installer Manual...
  • Page 37: Three-Phase (120/208Vac) Pcs Parallel Connection

    4.21. Three-Phase (120/208Vac) PCs Parallel Connection HYBRID INVERTER | Installer Manual...
  • Page 38: Operation

    5. OPERATION 5.1. Display LED indicator Meaning Green LED solid light PV connection normal Green LED solid light Grid connection normal Normal Green LED solid light Inverter functioning normally Alarm Red LED solid light Fault Function Key Description To exit the previous mode Increase the value of a setting Down Decrease the value of a setting...
  • Page 39: Home Page

    5.3. Home Page Press the Esc button any page to access the home page: 1. Customer name 2. Access the settings menu page 3. Access solar history 4. Access system status page SOLAR/TURBINE AC load 5. Access system status page 6. Access grid history 7.
  • Page 40: System Flow Page

    What this page displays: Total solar power produced. Inverter voltage. ƒ ƒ MPPT 1 power/voltage/current. Inverter current. ƒ ƒ MPPT 2 power/voltage/current. Load power. ƒ ƒ Grid power. Load voltage. ƒ ƒ Grid frequency. Battery power charge/discharge. ƒ ƒ Grid voltage. Battery SOC.
  • Page 41: Setup Page

    What this page displays: The system flow. Battery status. ƒ ƒ MPPTs power. Power distribution to load or grid. ƒ ƒ 5.6. Setup Page To access Settings, click on the gear icon on the right top of the navigation menu. What this page displays: Serial number.
  • Page 42: Set Time (Clock)

    Access the Grid Setup Page (press the GRID icon). ƒ Access the real-time programmable timer/system mode (press the SYSTEM MODE icon). ƒ Access the advanced settings such as Paralleling and Wind Turbine (press the ADVANCE icon). ƒ Access the auxiliary load/smart load settings (press the AUX LOAD icon) ƒ...
  • Page 43: Factory Reset And Lock Code

    How to change the name: Change the letters in each box by moving the arrows up and down and then select OK. This will change the name on the home screen. SOLAR/TURBINE AC load BATTERY IN/OUT MPPT. GRID. Battery Grid How to set the auto dim: Set a number in the auto dim box to dim the LCD after a number of seconds.
  • Page 44: Battery Setup Page

    System self-check: Allows the user to conduct a system diagnosis. Test mode (only for engineers): For engineers to conduct tests. 5.10. Battery Setup Page To configure battery settings, click on the BATTERY icon and then on ‘Batt type’. What this page displays: Battery capacity in (Ah) –...
  • Page 45: Generator & Battery Page

    BMS setting. ƒ Active battery - This feature will help recover a battery that is 100% discharged by slowly changing from ƒ the solar array. Until the battery reaches a point where it can change normally. 5.11. Generator & Battery Page To configure battery charging settings, click on the BATTERY icon and then on ‘Batt Charge’.
  • Page 46 1Amp 12V. Below is a simple reference circuit of an auto-start system that can autostart generators on a boat. (Sunsynk will be releasing a new OS E406 ( Auto-Start ) for better generator control).
  • Page 47: Battery Discharge Page

    5.12. Battery Discharge Page To configure inverter’s shutdown settings, click on the BATTERY icon and then on ‘Shut Down’. HYBRID INVERTER | Installer Manual...
  • Page 48 Activating Shutdown causes the inverter to enter standby-mode. It does not entirely shut down the inverter. Total shutdown occurs at voltages below 19V. The voltage displayed on the Sunsynk Parity Inverter will vary depending on whether the inverter is charging or discharging the batteries.
  • Page 49: Setting Up A Lithium Battery

    The batteries recommended for use with the Sunsynk systems are AGM Lead Acid or Lithium Battery Banks. (‘AGM’ means Absorbed Glass Matt construction that allows the electrolyte to be suspended new the plate’s active material. In theory, this enhances both the discharge and recharging efficiency. AGM batteries are very heavy as a result).
  • Page 50 PLEASE NOTE With some types of lithium batteries, the BMS cannot be controlled by the Sunsynk inverter. In this case, treat the battery as a lead-acid type and set the charging and discharging protocol following the battery manufacturer's specifications.
  • Page 51 RS485 Inverter Brand Model Storage Notes or CAN Setup Inverter US2000B RS485 US3000 RS485 US2000C RS485 US3000C  RS485 PYLON UP5000 RS485 US5000 RS485 Force L1 RS485 Force L2 RS485 HUBBLE AM-2 5.5KW  SSIF2P15S48100C RS485 SACRED SUN FCIFP48100A RS485 Cut Line 3, 6, 8 ...
  • Page 52 RS485 Inverter Brand Model Storage Notes or CAN Setup Inverter IPACK DOWELL C3.3/IPACK  C6.5/IPACK C10 G2500-48V  Giter G5040-48V CFE2400 CF Energy CFE5100  CFE5100S Batterich/ UP3686 Greenrich BYD Battery-Box LV Flex Lite RJ45 Pin 1: GND 48NPFC80 RS485 RJ45 Pin 2: RS485_A RJ45 Pin 3: RS485_B RJ45 Pins 4, 5, 6, 7, 8: No...
  • Page 53 RS485 Inverter Brand Model Storage Notes or CAN Setup Inverter Shanghai GTEM-48V2500 Green RS485 Tech Co.,Ltd. Unipower UPI.FP4845 RS485 LD-100P210J RS485 B-LFP51.2V 100Ah Float voltage 54.5V B-FLP51.2V 125Ah Absorption V 55.00V B-LFP48-130E 51.2V Disable equalisation 0 130Ah Days B-LFP48-160E 51.2V Shutdown 20% 160Ah Low Batt 35%...
  • Page 54: Program Charge & Discharge Times

    5.14. Program Charge & Discharge Times To set ‘Charge’ and ‘Discharge’ times, click on the ‘System Mode’ icon after clicking on the gear icon. What this page displays: A setting to prevent the inverter exporting power to the grid - ‘Zero Export’. ƒ...
  • Page 55 Example: This example shows the battery being charged up to 100% by both the Grid and Solar PV from 8 a.m. to 11 a.m. and then being able to supply up to 4kW of battery-power to the ‘essential’ loads from the ‘Load’ Port until the battery SOC drops to 50%.
  • Page 56: Grid Supply Page

    Example: The power produced is supplying the ‘Non-Essential Load’ while the inverter is set at a maximum power of 8kW (Max Sell Power). The inverter is connected to the grid, but no export is performed. The unit allows small amounts of power to flow from the Grid (100W Zero Export Power) to prevent any back-flow. In this example, the solar PV is prioritised to supply the Load first and then subsequently, charge the battery.
  • Page 57: Connecting The Drm's

    5.16. Connecting the DRM’s This can be selected under advance settings. This can be selected under advance settings. 1. DRM 1/5 5. Ref 0 2. DRM 2/6 6. D Ground 3. DRM 3/7 7. Net J 4-7 4. RDRM 4/8 8. Net J 4-7 HYBRID INVERTER | Installer Manual...
  • Page 58: Advanced Settings For Paralleling Inverters

    Set the phase in which the inverter will be paralleled. Set the Modbus SN for paralleling. The Sunsynk parity inverter can be wired standalone or where more power is required it can be connected in parallel either single or 3 phase configuration. The maximum number of inverters that can be paralleled in a single phase utility grid is 16 and the maximum number that can be paralleled in a three phase utility grid is 15.A...
  • Page 59 Each invert will require a fuse isolator with surge protection and each group circuit will require an RCD. If the batteries as supplying power to the main load during the outage then a change over switch will also be required or a split load can be used. The CT coils used to limit export power must only be connected to the master.
  • Page 60 If you need further help please refer to the Sunsynk website where you will find training videos and Fre- quently Asked Questions www.sunsynk.com. Firmware prior installation is important to be updated and all inverters in parallel or three phase system must be the same.
  • Page 61: Solar Power Generated

    5.18. Solar Power Generated This page shows the daily, monthly, yearly, and total solar power produced. Access this page by clicking on the ‘Solar/Turbine’ icon on the Home Page. 5.19. Grid Power This page shows the Daily / Monthly / Yearly and total grid power export or consumed. Access this page by clicking on the ‘Solar/Turbine’...
  • Page 62: Advanced Settings For Wind Turbines

    5.20. Advanced Settings for Wind Turbines To configure wind turbine settings, click on the ADVANCE icon. What this page displays: If one or both of the MPPTs are connected to a wind turbine. ƒ What you can do from this page: Select the MPPT to be used as a turbine input.
  • Page 63: Advanced Settings For Auxiliary Load

    Most wind turbines are three-phase PM type. Therefore, either a wind turbine controller or a direct connec- tion to the MPPT via a simple protection circuit will be required. Dump Load or Diversion Load is an important part of an off-grid power system. When the battery ( Battery Bank ) is fully charged, and the water turbine / wind turbine / solar PV module is still generating, a dump load is a useful device to send spare electricity to.
  • Page 64: Advanced Settings For Peak Shaving

    Aux Load off Battery % or Voltage Battery level when the Aux load switches off Aux Load on Battery % or Voltage Battery level when the Aux load switches on. Solar Power Power limiter to the maximum power allowed to the Aux load. Gen Input Tick this box if using a Generator.
  • Page 65: Fault Codes

    Description Solutions Inverter work mode changed 1.Reset the inverter. Working Mode Change 2.Seek help from Sunsynk. AC Slide over current fault. AC over current fault or 1.Check if the backup load power is within the range of the hardware inverter.
  • Page 66 Error Code Description Solutions PV isolation resistance is too low 1.Check if the connection of PV panels and inverter are firmly DC insulation impedance connected. failure 2.Check if the earth bond cable on inverters is connected to the ground. 1.Please wait 5 minutes to see if it returns to normal. The bus bar is unbalanced 2.
  • Page 67 Chapter 3, ‘Technical Specifications’. If you need further help please refer to the Sunsynk website where you will find training videos and frequent- ly asked questions www.sunsynk.com.
  • Page 68: Commissioning

    6. COMMISSIONING 6.1. Start-Up / Shutdown Procedure The inverter must be installed by a qualified / licensed electrical engineer in accordance with the country's wiring regulations. Before switching on, the installation engineer must have completed the Earth Bond, RCD and earth leakage tests, checked that the solar panel Voc voltage does not exceed 480V and checked the battery voltage.
  • Page 69: Gdfi Fault

    Check each bond on the Check the VOC does not Ensure both MPPTs are solar panels exceed 480V balanced Measure the supply volt- If it falls out of the setting age check it matches the range it will cause the in- See Grid Setup page settings of the inverter verse shut down and alarm...
  • Page 70 APPENDIX A The following table is the connection on battery side: Protocol Description Pin 1: CAN-H Pin 5: CAN-L Pin 2, 3, 4, 6, 7, 8: NC Pin 1: RS485B Pin 2: RS485A Pin 3, 6: GND RS485 Pin 7: RS485A Pin 8: RS485B Pin 4, 5: NC Pin 3: BMS transmit;...
  • Page 71 Instantaneous APPENDIX E The Sunsynk inverter can be connected to the internet, but you need to add a data logger to do this. The inverter is compatible with Solar Man data-loggers, which you can obtain from us with your distributor 1.
  • Page 72 wered by...

This manual is also suitable for:

Sunsynk-8k-sg03lp1

Table of Contents