ultracomfort UC114 Owner's Manual page 8

Power lift & recline chair
Hide thumbs Also See for UC114:
Table of Contents

Advertisement

Installation Of Your Power Lift Chair
Remove the transformer and hand control from under the chair and place
1.
two 9 volt batteries in transformer as shown. Place transformer on
the fl oor behind the chair.
2. Plug the transformer into a 115-120V 60Hz A.C. outlet and connect
the power cable from the chair into the transformer as shown. Power
cable is located under the chair attached to the motor with white zip
tie. Remove zip tie, extend the cable under and out behind the chair.
Plug
To outlet
115-120V A.C.
Plug the hand control into the
3.
lock located at the back of the
seat and lay it on top of the seat
see page 8 hand control
routing.
Align the back brackets and the
4.
seat brackets, then push on the
seat back until they are locked
into place.
Attach the bottom of the
5.
outside back to the Velcro on
the arm cross rail.
Place the chair in the desired
6.
position in the room, keeping it
20" from the wall. If placing the
chair into a corner, keep it 20"
from the wall as shown. See
distance chart below for your
model.
Distance Required From Wall
When Reclined
Model No.
UC114
UC216
Adjust the leg levelers on the bottom of the chair if necessary to level the chair.
7.
Some high pile carpets can obstruct the footrest operation by rubbing against
it. Adjust the levelers to a height above the pile.
Models UC
L.E.D. light
DC Power
Transformer
Wall
Corner
20 in.
20 in.
20 in.
20 in.
114 and UC216
L.E.D. light
From motor
20"
Side
View
8
Bottom view of
Transformer
Install two 9 volt batteries
in transformer for battery
backup (See page 12)
(batteries not included)
20"
Corner
Top
View
20"

Advertisement

Table of Contents
loading

Table of Contents