January 2023 Revision History Date Reason for Update January 2023 New Release MEC Aerial Work Platforms 1401 S. Madera Avenue, Kerman, CA 93630 USA Toll Free: 1-877-632-5438 Phone: 1-559-842-1500 Fax: 1-559-842-1520 info@MECawp.com www.MECawp.com Page i - XD - Service & Parts Manual Nano10 ™...
All parts represented here are manufactured and supplied in accordance with MEC quality standards. We recommend that you use genuine MEC parts to ensure proper operation and reliable performance. To obtain maximum benefits from your MEC Aerial Work Platforms, always follow the proper operating and maintenance procedures.
Any procedures not found within this manual must be evaluated by the individual to assure oneself that they are “proper and safe.” Your MEC Aerial Work Platform has been designed, built, and tested to provide many years of safe, dependable service. Only trained, authorized personnel should be allowed to operate or service the machine.
Safety Symbols & General Safety Tips Safety Symbols & General Safety Tips MEC manuals and decals use symbols, colors and signal words to help you recognize important safety, operation and maintenance information. RED and the word DANGER – Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury ORANGE and the word WARNING –...
Section 3 - Specifications January 2023 Specifications, Indoor Rated Only Indoor 16.4 ft 5.0 m Height, Working Maximum Indoor Rated Only Indoor Rated Only Outdoor Indoor 9.8 ft 3.0 m Height, Platform Maximum Indoor Rated Only Indoor Rated Only Outdoor Height, Stowed Maximum 5.3 ft 1.60 m...
Page 9
Section 3 - Specifications January 2023 Specifications, Indoor/Outdoor Rated Indoor 16.4 ft 5.0 m Height, Working Maximum Outdoor 13.5 ft 4.3 m Indoor 9.8 ft 3.0 m Height, Platform Maximum Outdoor 7.5 ft 2.3 m Height, Stowed Maximum 5.3 ft 1.60 m Indoor Maximum Personnel...
Section 4 - Torque Specifications January 2023 Bolt Torque Specification - American Standard Bolt Torque Specification - American Standard Fasteners Use the following values to apply torque unless a specific torque value is called out for the part being used. American Standard Cap Screws SAE Grade Cap Screw...
Section 4 - Torque Specifications January 2023 Bolt Torque Specification - Metric Standard Fasteners Use the following values to apply torque unless a specific torque value is called out for the part being used Metric Cap Screws Metric Grade 109 10.9 Cap Screw Size Torque...
Section 4 - Torque Specifications January 2023 Hydraulic Components Torque Table Note:Always lubricate threads with clean hydraulic fluid prior to installation. Use the following values to torque hydraulic components when a specific value is not available. Always check for torque values in the following places before relying on the Hydraulic Components Torque Table.
Page 13
Section 5 - Hydraulic System, Electrical System and Total System January 2023 Hydraulic System, Electrical System and Total System Hydraulic System, Electrical System and Total System Hydraulic System HYDRAULIC FLUID UNDER PRESSURE CAN PENETRATE AND BURN SKIN, DAMAGE EYES, AND MAY CAUSE SERIOUS INJURY, BLINDNESS, AND EVEN DEATH CORRECT LEAKS IMMEDIATELY HYDRAULIC FLUID LEAKS UNDER PRESSURE MAY NOT ALWAYS BE VISIBLE CHECK FOR PIN HOLE LEAKS WITH A PIECE OF CARDBOARD,...
Section 7 - Emergency Systems and Procedures January 2023 Emergency Systems and Procedures Emergency Systems and Procedures IF THE CONTROL SYSTEM FAILS WHILE THE PLATFORM IS ELEVATED, HAVE AN EXPERIENCED OPERATOR USE THE EMERGENCY LOWERING PROCEDURE TO SAFELY LOWER THE PLATFORM DO NOT ATTEMPT TO CLIMB DOWN ELEVATING ASSEMBLY Emergency Stop The machine is equipped with an EMERGENCY STOP switch at the base...
Section 8 - Transport and Lifting Instructions January 2023 Transport and Lifting Instructions Transport and Lifting Instructions Observe and Obey: • Common sense and planning must be applied to control the movement of the machine when lifting it with a crane or forklift. Only qualified aerial lift operators should move the machine on or off the truck.
Page 17
Section 8 - Transport and Lifting Instructions January 2023 Turn the key switch to the “OFF” position and remove the key before transporting. Inspect the entire machine for loose or unsecured items. Use the tie-down points on the chassis for anchoring down to the transport surface. Use a minimum of four chains or straps.
Section 9 - Maintenance January 2023 Maintenance Inspection Report Maintenance Inspection Report NANO 10 SCISSOR Fleet Equipment Number Date Inspector Name Inspector Co Model Number Address Serial Number Hour Meter Signature Machine Owner & address Maintain all service records in accordance with ANSI A9224-2019 *If an inspection receives an “N”, remove from service.
Section 9 - Maintenance January 2023 Daily Maintenance The following maintenance should be done daily or every 8 hours. 1) Inspect the Manuals and Decals Keeping the operator’s manual in good condition is essential to safe machine operation. The operator’s manual is included with each machine and is stored in the manual box in the platform. An illegible or missing manual will not provide safety and operational information necessary for a safe operating condition.
Page 20
Section 9 - Maintenance January 2023 fluid levels or damaged cables and connections can result in component damage and hazardous conditions. Note:This check is not required for machines with sealed batteries or maintenance-free batteries. Electrocution hazard Contact with hot or live circuits may result in death or serious injury Remove all rings, watches and other jewelry Bodily injury hazard Batteries contain acid Avoid spilling or contacting battery acid Neutralize battery acid spills with baking soda and water...
Section 9 - Maintenance January 2023 Quarterly Maintenance The following maintenance should be done every 3 months or 250 hours of operation. 1) Inspect the Batteries • Tools will be required to perform this procedure. • New parts will be required to perform this procedure. Proper battery condition is essential to good machine performance and operational safety.
Page 22
Section 9 - Maintenance January 2023 follows: • Add 0.004 to the reading of each cell for every 42°F ART_6026 (5.5°C) above 80.1°F (26.7°C). • Subtract 0.004 from the reading of each cell for every 42°F (5.5°C) below 80.1°F (26.7°C). Result: All battery cells display a specific gravity •...
Page 23
Section 9 - Maintenance January 2023 • Ground controls wiring • Chassis side doors inside wiring • Steering Electric cylinder motor wiring • Raising Electric cylinder motor wiring • Platform controls wiring • Power to platform wiring 5. Inspect for a liberal coating of dielectric grease in the following locations: •...
Page 24
Section 9 - Maintenance January 2023 5) Test the Key Switch Proper key switch action and response is essential to safe machine operation. The machine can be operated from the ground or platform controls and the activation of one or the other is accomplished with the key switch.
Page 25
Section 9 - Maintenance January 2023 switch or the joystick when your reference point on the machine crosses the test line. 7. Measure the distance between the test line and your machine reference point. Result: The machine stops within the specified braking distance. No action required. •...
Page 26
Section 9 - Maintenance January 2023 5. Raise the platform approximately 4.3 ft (1.2 m) from the ground. 6. Press the drive function select button. 7. Choose a point on the machine; i.e., contact patch of a tire, as a visual reference for use when crossing the start and finish lines.
Section 9 - Maintenance January 2023 Semi-annual Maintenance The following maintenance should be done every 6 months or 500 hours of operation. 1) Test the Platform Overload System • Tools will be required to perform this procedure. • Dealer service will be required to perform this procedure. Testing the platform overload system regularly is essential to safe machine operation.
Section 9 - Maintenance January 2023 Yearly Maintenance The following maintenance should be done every year or 1,000 hours of operation. 1) Check the Scissor Arm Wear Pads • Tools will be required to perform this procedure. • New parts will be required to perform this procedure. Making sure that the condition of the scissor arm wear pads is good is essential to safe machine operation.
Page 29
Section 9 - Maintenance January 2023 If the Electric Cylinder sends out abnormal sound, please add the lubricating grease promptly. Fat-liquoring 1. Raise the platform to the position where the fat-liquoring Port port exposes completely. 2. Disconnect the battery pack from the machine, and let the machine stand for an hour at last.
This Parts sections consists of illustrated parts sections and is designed to provide you, the customer, with illustrations and the list of associated parts needed to properly maintain the MEC self-propelled aerial work platform. When used in conjunction with the Service section in this manual and the Operator’s Manual (provided separately), this manual will assist you in making necessary adjustments...
Page 33
Section 11 - Chassis January 2023 Steer Linkage and Wheels Assembly Steer Linkage and Wheels Assembly ILLUSTRATION No. Nano10-XD Steer Linkage and Wheels Assembly ART_5974 Page 29 - XD - Service & Parts Manual Nano10 ™...
Page 34
Section 11 - Chassis January 2023 Item Part Number Description Qty 46540 Screw 46541 Cotter Pin 46542 46543 Electric Cylinder Unit 41322 Cotter Pin 53123 Screw SHCS M06-1.00 × 25 53046 WSHR M06 Spring Washer 50000 WSHR M06 Standard Flat Washer 46544 Wheel 46545...
Ground Control Motor Assembly Controller Motor Controller Charger Electric Cylinder Unit Drive Motor Fuse Assembly Contactor Assembly Drive Battery Motor Motor Controller Assembly ILLUSTRATION No. Nano10-XD Electrical Harness ART_5985 Page 59 - XD - Service & Parts Manual Nano10 ™...
Page 64
Section 14 - Electrical System January 2023 Item Part Number Description Qty 46631 Chassis Harness 1 46632 Platform Control Box Harness 46634 Chassis Harness 2 46635 Power Harness 46636 Power Harness 46637 Power Harness 44545 Power Harness 46638 Power Harness 46639 Power Harness 46640...
Page 65
Nano10-XD 12/6/2022 Section 15 - Decals January 2023 Decals Decals Both Sides 14 15 14 15 Page 61 - XD - Service & Parts Manual Nano10 ™...
Page 67
January 2023 Page 63 - XD - Service & Parts Manual Nano10 ™...
Page 68
January 2023 Page 64 - XD - Service & Parts Manual Nano10 ™...
Page 69
January 2023 Page 65 - XD - Service & Parts Manual Nano10 ™...
Page 70
MEC Parts Order Form Phone: 559-842-1523 Fax: 559-400-6723 Email: Parts@mecawp.com Please Fill Out Completely: Date: Ordered By: Account: Your Fax No: Bill to: Ship to: Purchase Order Number Ship VIA ** All orders MUST have a Purchase Order Number **Fed Ex shipments require Fed Ex account number...
MEC Aerial Platform Sales Corp. and is found upon inspection by MEC Aerial Platform Sales Corp. to be defective in material and/or workmanship. MEC Aerial Platform Sales Corp. shall not be liable for any consequential, incidental or contingent damages whatsoever.
Page 72
MEC Aerial Work Platforms 1401 S. Madera Avenue, Kerman, CA 93630 USA Toll Free: 1-877-632-5438 Phone: 1-559-842-1500 Fax: 1-559-842-1520 info@MECawp.com www.MECawp.com...
Need help?
Do you have a question about the Nano10-XD and is the answer not in the manual?
Questions and answers