Physical installation projector
4.4 Connecting the projector with the power net
WARNING: The total electrical installation should be protected by an appropriate rated and readily
accessible disconnect switch, circuit breakers and ground fault current interrupters. The installation
shall be done according to the local electrical installation codes.
CAUTION: ALL POWER CONNECTIONS to the SP2K-C projector are made to the five-terminal
strip located on the mains board behind the operator side cover and mains cover of the projector.
CAUTION: The cross-sectional area of the conductors in the Power Supply Cord shall be not less
than 4 mm
2
Required tools
•
Flat screwdriver
•
Open-end wrench 30 mm
•
Torx screwdriver T20
Required parts
•
Certified AC power supply cord 4 mm², 10 AWG, min. 300 V (in case of mono phase or Δ configuration)
•
Certified AC power supply cord 4 mm², 10 AWG, min. 500 V (in case of Y configuration)
How to connect the main AC power with the projector
1.
Make sure the net input cover has been removed. For more info, see
page
41.
2.
Guide the AC power cord (reference 2) through the cable gland (reference 3).
3.
Connect the wires (references 4 and 5) to the 5–terminal strip (reference 6) as illustrated. Use a torque
screwdriver to fasten the screws of the 5-terminal strip with a torque of 3.3 Nm.
Warning:
Image 4–11
2
AC Power cord
3
Cable gland
4
Protected Earth (PE) wire
44
R5914712 /00
SP2K-C
or AWG 10.
Always connect the PE wire (reference 4) first, then the other wires.
"Accessing the power connections",
5
Neutral (N) wire
5
Phases wiring (L1–L3)
6
5–terminal strip