Switch Bank 1; Test Mode; Test Speed Decrement / Increment - Zamboni FastICE Training Manual

Ice making system
Table of Contents

Advertisement

Switch Bank 1

Figure 2: Switch Bank 1; contains the switches used to control flow to the upper and lower boom

Test Mode

This switch allows the machine operator to put the system into a mode where a driving speed is
simulated, thereby producing ice making water flow from the booms that are activated.
This mode allows for an assessment of the health of the spray system, and allows for the
operator to assess the quality of the spray coming from each spray nozzle.

Test Speed Decrement / Increment

This switch increases or decreases the TEST MODE simulated speed.
Zamboni FastICE
®
Training Manual
DK - 11001
Training Manual
TEST MODE (ON-OFF)
TEST SPEED FOR TEST MODE (DECREMENT
MOMENTARY – HOLD – INCREMENT MOMENTARY)
MALFUNCTION INDICATOR LAMP (MIL)
BOARD SPRAY SWITCH (OFF-ON)
Page 6 of 20

Advertisement

Table of Contents
loading

Table of Contents