Recommended Ice Resurfacing Procedure - Zamboni FastICE Training Manual

Ice making system
Table of Contents

Advertisement

Recommended Ice Resurfacing Procedure

1. Fill the Ice Making Water tank to between 50% and 100% full. The amount of water in the
tank should be determined by how much ice thickness you plan to build.
2. If you are using the system for either the first time or are using it after draining the Ice Making
Water tank completely, you will need to purge the pump housing of air, and the control valve
manifold assembly of air. With the machine and system off, open the upper valve on the pump
housing until a continuous stream of water comes out of the valve:
2.a.
Pump purge valve location:
Zamboni FastICE
®
Training Manual
DK - 11001
Training Manual
PURGE
VALVE
Page 15 of 20

Advertisement

Table of Contents
loading

Table of Contents