Setting Up; Front Panel Indicators - Honeywell FF-SB14 Series Installation And Maintenance Manual

Industrial safety light curtain for the protection of machine operators
Hide thumbs Also See for FF-SB14 Series:
Table of Contents

Advertisement

5. Setting up

5.1

Front panel indicators

Emitter
E1: yellow indicator
Power on indicator
E2: yellow indicator
Synchronisation beam reception indicator
Lights on if the synchronisation beam is established
Note: E2 normally lights on if the occultation occurs
near the emitter
E1
28
E2
Receiver
R1: red indicator. Normally OFF. Flickers when
reception level is too low. Lits on during test or during
a beam interruption near the receiver, or in case of
important misalignment.
R2: red indicator. Lits on when relays are de-
energized.
R3: green indicator. Lits on when relays are energized
R4: yellow indicator. Normally OFF.
Test input implementation. Lits during test and flickers
if the system needs to be reset.
107026-11-EN FR26 ROW 302 Printed in France

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ff-sb14e s2 seriesFf-sb14r s2 series

Table of Contents