Finishing The Indoor Unit Installation; To Mount The Suction Grille And Decoration Side Panel; Commissioning; Checklist Before Commissioning - Daikin FXHQ32AVEB8 Installation And Operation Manual

Vrv system air conditioner
Hide thumbs Also See for FXHQ32AVEB8:
Table of Contents

Advertisement

15 Finishing the indoor unit installation

15
Finishing the indoor unit
installation
NOTICE
Block any gaps around pipes and cables with sealing
material (accessory) to avoid dust from entering the indoor
unit.
15.1
To mount the suction grille and
decoration side panel
1 Install securely in the reverse order. Refer to
unit" [ 4  14].
indoor
2 When installing the suction grille, attach the strap of the suction
grille to the hook on the indoor unit.
INFORMATION
When closing the suction grille, make sure the straps of the
suction grille are not pinched anywhere.
a
b
c
d
b
e
f
a
Round hole
b
Hook
c
Strap
d
Indoor unit
e
Suction grille
f
Cross-shaped hole
16

Commissioning

NOTICE
General
commissioning
commissioning instructions in this chapter, a general
commissioning checklist is also available on the Daikin
Business Portal (authentication required).
The general commissioning checklist is complementary to
the instructions in this chapter and can be used as a
guideline and reporting template during commissioning and
hand-over to the user.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
16.1

Checklist before commissioning

1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.
You have read the complete installation and operation
instructions described in the installer and user reference
guide.
The indoor unit is properly mounted.
The outdoor unit is properly mounted.
Installation and operation manual
20
"To open the
a
b
c
checklist.
Next
to
the
The drain piping is properly installed and insulated, and
drainage flows smoothly. Check for water leaks.
Possible consequence: condensate water might drip.
The refrigerant pipes (gas and liquid) are installed
correctly and thermally insulated.
There are NO refrigerant leaks.
There are NO missing phases or reversed phases.
The system is properly earthed and the earth terminals
are tightened.
The fuses or locally installed protection devices are
installed according to this document, and have NOT been
bypassed.
The power supply voltage matches the voltage on the
identification label of the unit.
There are NO loose connections or damaged electrical
components in the switch box.
There are NO damaged components or squeezed
pipes on the inside of the indoor and outdoor units.
The stop valves (gas and liquid) on the outdoor unit are
fully open.
16.2

To perform a test run

INFORMATION
▪ Perform the test run according to the instructions in the
outdoor unit manual.
▪ The test run is only completed if there is no malfunction
code displayed on the user interface or the outdoor unit
7‑segment display.
▪ See the service manual for the complete list of error
codes and a detailed troubleshooting guideline for each
error.
NOTICE
Do NOT interrupt the test run.
17

Configuration

17.1

Field setting

Make the following field settings so that they correspond with the
actual installation setup and with the needs of the user:
▪ Ceiling height
▪ Air volume when thermostat control is OFF
▪ Time to clean air filter
▪ Thermostat sensor selection
▪ Thermostat sensor in group control
▪ Thermostat differential changeover (if remote sensor is used)
▪ Automatic changeover differential
▪ Auto-restart after power failure
▪ T1/T2 input setting
FXHQ-A
VRV system air conditioner
3P668115-3E – 2022.11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fxhq63aveb8Fxhq100aveb8

Table of Contents