STEP 5:
Slip in the Top Rack (1) and slip-in the Taper
Ring M6 (16) 4 off , and Screw M6 x 25 (7) 4 off,
through the Mounting holes in the Top Rack
and Brackets and, secure from the bottom,
using the Nut M6 (15) – 6 off and tighten it to
the torque .
Copyright By SRC
Design and Specification are subjected to change
Rear Rack as shown "Final Assembled condition"
Page 6