Table Of Contents - Bosch D9412GV3 Operation And Installation Manual

Hide thumbs Also See for D9412GV3:
Table of Contents

Advertisement

.
Contents
1.0
Introduction ......................................................7
2.0
Lightning Strikes .............................................8
2.1
Effects .................................................................8
2.2
Precautions during Installation ........................8
3.0
Overview............................................................9
3.1
Configuration and Parts....................................9
3.1.1
Parts List ...........................................................10
3.1.2
3.2
Accessories ......................................................11
3.3
3.3.1
SDI Molex Connector......................................12
3.3.2
Tip and Ring Posts ..........................................12
3.3.3
Telephone Line Sniff .......................................12
3.3.4
Points ................................................................12
3.3.5
Areas and Accounts ........................................12
3.3.6
Digital Communicator......................................12
3.3.7
Keypads ............................................................13
3.3.8
Keyswitch..........................................................13
3.3.9
Access Control.................................................13
3.3.10 Event Memory ..................................................13
3.3.11 Event Log..........................................................13
3.3.12 Ground Fault Detection ..................................13
3.3.14 Conettix Functions...........................................14
3.3.15 Programming....................................................14
3.3.16 Other Features.................................................14
4.0
Installation.......................................................14
4.1
Installation Preparation ...................................14
4.2
Enclosure Options ...........................................14
4.3
Mounting Enclosure ........................................14
4.4
Installing the Control Panel ............................15
4.5
Connecting Earth Ground...............................15
4.5.1
Terminal 10.......................................................15
4.5.2
Ground Fault Detect Enable ..........................15
4.5.3
Enabling Ground Fault Detection ..................16
4.5.4
Ground Fault Specifications...........................16
4.5.5
Locking the Reset Pin .....................................16
4.6
Completing the Installation.............................17
4.6.1
Charging the Battery .......................................17
4.6.2
4.6.3
Installing Modules and Relays.......................17
4.6.4
Keypads ............................................................17
4.6.5
Powering Up.....................................................17
Bosch Security Systems, Inc. | 10/10 | F01U143070-03
D9412GV3/D7412GV3 | Operation and Installation Guide | Contents
4.7
Programming the Control Panel.................... 17
4.8
Installing the Point Chart Label ..................... 18
4.9
Testing the System ......................................... 18
4.10
Service Walk Test ........................................... 18
5.0
Power Supply ................................................. 22
5.1
5.1.1
Primary (AC) Power Circuit............................ 22
5.1.2
Installing the Transformer .............................. 22
5.2
Secondary Power Terminals ......................... 22
5.2.1
Secondary (DC) Power .................................. 22
5.2.2
Installing the Battery........................................ 22
5.2.3
Replacing the Battery ..................................... 24
5.2.4
Battery Supervision......................................... 24
5.2.5
Battery Charging Circuit ................................. 24
5.2.6
6.0
Power Outputs ............................................... 26
6.1
Circuit Protection ............................................. 26
6.2
Total Available Power..................................... 26
6.3
and 32 ............................................................... 26
6.4
and 8 ................................................................. 27
6.4.1
Programming ................................................... 27
6.4.2
Terminals 6 and 7 ........................................... 27
6.4.3
Fire System Power Formula .......................... 27
6.4.4
Terminal 8......................................................... 27
7.0
Telephone Connections .............................. 28
7.1
Registration ...................................................... 28
7.2
Notification........................................................ 28
7.3
Location ............................................................ 28
7.4
Telephone Cord Connection.......................... 28
7.5
Phone LED (Red) ............................................ 29
7.6
Operation Monitor LED (Green).................... 29
7.7
Dialing Format ................................................. 29
7.8
Telephone Line Monitor.................................. 29
7.9
Called Party Disconnect................................. 29
7.10
Communication Failure .................................. 29
7.11
D928 Dual Phone Line Switcher ................... 30
7.11.1 Description ....................................................... 30
7.11.2 Operation.......................................................... 30
7.11.3 Installing the D928 .......................................... 31
7.11.4 D928 Status LEDs........................................... 31
8.0
On-Board Points............................................ 31
8.1
Terminals 11 to 22 Description ..................... 31
8.2
Point Sensor Loops......................................... 31
8.3
Point Parameters............................................. 32
8.4
Point Response Time ..................................... 33
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D7412gv3

Table of Contents