Operation; Putting Into Operation; Operating The Machine; Check Charge State Of Rechargeable Battery - Wacker Neuson AS30e Operator's Manual

Table of Contents

Advertisement

Operation

11.1 Putting into operation

11
Operation
11.1
Putting into operation
1
2
11.2

Operating the machine

11.3

Check charge state of rechargeable battery

42
1 Start button Actuation/deactivation
2
2 Control light Charge condition
3 Guide bracket
4 Start lever
ü Machine stands upright on suitable ground when starting.
3
1.
Set the start lever 4 to the OFF position.
4
2.
Hold the machine by the guide bracket 3.
3.
Press start button activation/deactivation 1.
4.
Check the current state of charge via the control light Charge state
2.
1 Start lever
2 Safety lever
5.
Pull the safety lever 2 with one hand.
1
6.
Slowly press the start lever 1 forward.
ð The machine starts up.
ð Vibration begins when moved forward.
• The operator's designated location is behind the machine.
• Guide and steer the machine using the guide bracket.
• Use the weight of the machine when working.
• Let the machine move forward on its own. Do not use your muscles
to push it forward or pull it back.
• For optimal control, performance and minimum hand and arm vibra-
tion, hold the guide bracket on the left and right.
• To avoid damage to the machine, do not move the machine when it is
running.
• Exercise caution with rough material. To avoid extreme wear and tear
to the ramming plate, ensure that it is always parallel to the ground
being compacted.
Check charge condition of rechargeable battery on a regular basis.
Operator's manual | AS | 5100056974 | 06/2020 | [us]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

As50eAs60eC48/4Bp1000Bp1400

Table of Contents