10

Commissioning

10.1
Tests before commissioning
10.2

Charge the rechargeable battery

10.3

Install the rechargeable battery

[us] | 06/2020 | 5100056974 | AS | Operator's manual
Information
Further information and detailed descriptions,
page
45.
Perform the following checks:
• Check machine and components for damage.
– Do not put the damaged machine into operation. Damages and
defects must be repaired immediately.
• Check shift lever and safety lever for ease of movement.
• Remove loose packing material from the machine.
• Observe the current regulations of the local authorities regarding
noise emissions.
• Check the charge state of the accumulator.
• Check grease or lubricating oil.
• Check to ensure the screw connections are firmly seated.
NOTICE
Damage to the machine or the accumulator.
Only use chargers and rechargeable batteries from the manufacturer.
Charge the rechargeable battery
1.
Place the battery charger and rechargeable battery on a dry and
clean working area.
2.
Connect the battery charger to the power source.
3.
Then connect the rechargeable battery to the battery charger.
4.
Check the charge state of battery regularly.
5.
If the rechargeable battery is completely charged, unplug the battery
from the charger and disconnect the battery charger from the power
source.
NOTICE
Damage to the machine or the accumulator.
Connections and contact area of the accumulator must be clean and dry.
Commissioning

Tests before commissioning 10.1