Summary of Contents for REC Peak Energy 72 Series

  • Page 1 INSTALLATION MANUAL rec Peak energy 72 series For the installation of all REC Peak Energy 72 solar panels, certified according to IEC 61215/61730.
  • Page 2: Table Of Contents

    Be sure to follow the safety instructions for all system components. Ensure relevant local codes and regulations for health and safety and accident prevention are observed. REC Peak Energy 72 Installation Manual - IEC 61215 / 61730 Rev E - 10.16...
  • Page 3: Introduction

    This does not apply to damages due to a panel fault, in cases of loss of life, bodily injury or damage to health or in the event of a grossly negligent breach of obligations on the part of REC SOLAR PTE. LTD. and/or in the event of an intentional or grossly negligent breach of obligations by a legal representative or vicarious agent.
  • Page 4: Electrical Installation

    Do not exceed the total system voltage permitted by the manufacturer, nor under any circumstance exceed the maximum system voltage of the panels (1000 V for the REC Peak Energy 72 Series and 1500 V for REC Peak Energy 72 XV Series panels).
  • Page 5: Mechanical Installation

    FIRE GUIDELINES REC Peak Energy 72 panels have a Class C fire rating. The fire rating of this panel is only valid when mounted in the manner specified in these mechanical mounting instructions. Utilize the following fire safety guidelines when installing REC Peak Energy 72 panels: •...
  • Page 6: Mounting The Panels

    MOUNTING THE PANELS REC Peak Energy 72 panels are designed for capturing solar radiation and are not suitable for installation as overhead or vertical glazing. The panels are considered to be in compliance with IEC 61215 /61730, only when the panel is mounted specified by the mounting instructions below.
  • Page 7 Installation using mounting holes REC Peak Energy 72 panels have been evaluated by UL for mounting using the four elongated holes 14 x 9 mm on the underside of the panel frame at a distance of 270 mm from the short side edge (fig. 7), utilizing rails and bolts matching the specifications below.
  • Page 8: Grounding

    To avoid galvanic corrosion, stainless steel fastening materials are preferred, however galvanized or hot dipped zinc plated fasteners are equally suitable. Negative grounding of the modules is not required. REC Peak Energy 72 Installation Manual - IEC 61215 / 61730 Rev E - 10.16 Ref: NE-06-06...
  • Page 9: Connections And Connectors

    CONNECTIONS AND CONNECTORS The connectors on REC Peak Energy 72 panels are rated IP67 only when connected. All connectors and cables must be secure and tight as well as electrically and mechanically sound. UV-resistant cables and connectors approved for outdoor use must be used. Conductor gauge must be chosen to ensure DC power losses (voltage drop) are kept to a minimum (<1%).
  • Page 10: Maintenance

    RECYCLING REC has made every effort to ensure panel packaging is kept to a minimum. The paper and cardboard packaging can be recycled and the protective wrapping and panel separating blocks are also recyclable in many areas. Please recycle according to local guidelines and regulations.
  • Page 11: Panel Information

    At low irradiance of 200 W/m² (AM 1.5 and cell temperature 25°C) at least 95.5% of the STC panel efficiency will be achieved. ** followed by the product designations 72 or 72 XV. REC Peak Energy 72 Installation Manual - IEC 61215 / 61730 Rev E - 10.16...
  • Page 12: Annex 1. Installations On Water Platforms

    INSTALLATION ENVIRONMENT Installation site • REC panels may only be installed on closed bodies of fresh water where water salinity does not exceed 25 mS/cm at 25°C (15 PSU). This specifically excludes mounting on sea and ocean applications. • The maximum permitted wave height must not exceed 1 m from the crest to the trough of the wave.
  • Page 13: Document History

    Textual updates according to UL 1703, Section 48. First publication of IEC version 12.2014 Revision of low light behavior data in Electrical Data 05.2015 Updates required by addition of 1500 V REC Peak Energy 72 XV Series 11.2015 Updates to Technical Information, General Data and low light behaviour value 08.2015 Updates to Technical Information, update to permitted clamping distance, addition of instructions for installations on floating pontoons.
  • Page 14 REC SOLAR PTE. LTD. 20 TUAS SOUTH AVENUE 14 SINGAPORE 637312 SINGAPORE Tel: +65 6495 9228 Mail: post@recgroup.com www.recgroup.com...