Contact And Site Information - Cisco UCS 6500 Series Installation Manual

Fabric interconnecthardware
Hide thumbs Also See for UCS 6500 Series:
Table of Contents

Advertisement

Site Planning and Maintenance Records
Task No.
5
6
1
2
3
4

Contact and Site Information

Use the following worksheet to record contact and site information.
Table 3: Contact and Site Information
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
Planning Activity
Cable and interface
equipment
evaluation:
• Cable type
• Connector type
• Cable distance
limitations
• Interface
equipment
(transceivers)
EMI evaluation:
• Distance
limitations for
signaling
• Site wiring
• RFI levels
Verify that the power supply installed in the chassis has a dedicated AC source circuit.
UPS = uninterruptible power supply.
EMI = electromagnetic interference.
RFI = radio frequency interference.
Verified By
Cisco UCS 6500 Series Fabric Interconnect Hardware Installation Guide
Contact and Site Information
Time
Date
65