Cisco UCS 6500 Series Installation Manual page 60

Fabric interconnecthardware
Hide thumbs Also See for UCS 6500 Series:
Table of Contents

Advertisement

Replacing Components
Recycling the PCBA
Step 7
Remove the heatsinks and DIMMs.
a) Using a #2 Phillips screwdriver, remove the screws that secure the heatsinks to the PCBA.
b) Lift each of the heatsinks off of the PCBA.
c) Grasp and remove the DIMMs from their sockets.
Cisco UCS 6500 Series Fabric Interconnect Hardware Installation Guide
50

Advertisement

Table of Contents
loading

Table of Contents