Initial Startup Procedures; Inspect The Electronics Cabinet - Siemens Maxum Edition II Installation Manual

Hide thumbs Also See for Maxum Edition II:
Table of Contents

Advertisement

Initial Startup Procedures

Before beginning with these procedures, verify that the Maxum II is installed correctly in
accordance with these instructions and local and national codes. See the custom
documentation for individual Maxum II details and/or procedures.
Note
Perform all the procedures in this section consecutively starting with inspection of the
Electronics Enclosure.
Follow local and plant regulations and obtain proper permits. Failure to follow proper safety
procedures may result in injury or death.
When the Electronic Enclosure door is open, voltage dangerous to life exists. These
procedures will involve operation of the unit with the electronics door open, which will require
a "hot work permit" in some locations to ensure that there are no hazards for the personnel
working in the area.
4.1

Inspect the Electronics Cabinet

The following procedure is a guide to verify that the connectors and plugs in the Electronic
Enclosure are properly connected.
Risk of overheating. Verify correct heater circuit connections. Incorrect connections may
result in injury or death.
In the air bath or airless configuration, the cable harness connectors and the chassis plugs
associated with the heater power circuits are marked with orange identifier tags. Before
reconnecting any connector or plug to a heater power circuit, verify that the orange identifier
tag on the connector or plug reads identically to the orange identifier tag on its mating
connector.
1. Ensure that the AC (Mains) power is off to the Maxum II.
2. Open the electronic enclosure door and inspect all power connections. This includes the
Power Entry Control Module for the air bath or airless configuration or the 24V Power supply
for the modular oven configuration.
3. Inspect all internal electrical connections (see WARNING above). This includes any
SYSCON, CIM, SNE, DPM, EPC, and SVCM connections as well as any other power
connections from the PECM or PECM-DC.
Installation Manual
Installation Manual, 12/2019, 2000595 Rev 1
WARNING
WARNING
4
37

Advertisement

Table of Contents
loading

Table of Contents