Mounting And Powering An Air Treater; Figure 3-4 Example Maxum Ii Outline Drawing (Air-Bath Or Airless Oven On Left And Modular Oven On Right) - Siemens Maxum Edition II Installation Manual

Hide thumbs Also See for Maxum Edition II:
Table of Contents

Advertisement

Installation Steps
3.4 Mounting the Analyzer
Figure 3-4
● With a mechanical lift such as the unit shown in Figure 3-3 Using a lift to install an analyzer
(Page 16) or adequate personnel, lift and align Maxum II mounting holes with those of the
house or shelter wall pre-drilled mounting holes.
● Insert the 12 or 16 bolts through Maxum II mounting brackets and into mounting wall stud
pre-drilled holes. Before tightening mounting bolts, be certain unit is leveled both
horizontally and vertically. Securely tighten all bolts to be certain the Maxum II is securely
mounted to the wall.
See also
Mounting the Analyzer (Page 16)
3.4.3

Mounting and Powering an Air Treater

The Air Treater is a catalytic device designed to remove hydrocarbons from ordinary plant
instrument air. Analyzers that include an FID will typically be equipped with an Air Treater, used
as a means to supply clean air to the detector. The Air Treater is an independent unit with its
own mounting and power. Mount the Air Treater in a convenient location near the Maxum II. The
mounting bracket requires four ¼" (6.35 mm) diameter bolts. Power the Air Treater per local
electrical codes, referring to the custom documentation package and the Maxum II Explosion
Protection Safety Standards Manual (A5E02220442001) for additional information.
18
Example Maxum II outline drawing (Air-bath or Airless Oven on left and Modular Oven on
right)
Installation Manual
Installation Manual, 12/2019, 2000595 Rev 1

Advertisement

Table of Contents
loading

Table of Contents