Installation Location; Space Requirements; Permissible Ambient Temperature; Permissible Relative Humidity - Siemens PGC 302 Edition II Manual

Process gas chromatograph
Table of Contents

Advertisement

Installation of chromatograph
Installation of chromatograph

INSTALLATION LOCATION

You must observe the following information
under Technical data.

Permissible ambient temperature

Permissible relative humidity

Power supply, power consumption

Lightning protection

Gas connections, gas purity

Purging air, control air

Space requirements

600 mm on both sides of chromatograph from
side wall or next chromatograph
Distance from wall at rear at least 100 mm
Distance from ceiling at least 200 mm
Swivelling radius of door 600 mm.
There are three manners in which the PGC
302
can be mounted:
edition II
M8 threaded holes in the rear panel.
Caution:
The max. thread depth is
10 mm!
Mounting rails (option)
Rack (option)
2
536
640
10
1056
4 x M8
0
1014
0
80
3INSTALL.CHP, Stand Dezember 22, 1999
420
420

Advertisement

Table of Contents
loading

Table of Contents