Page 1
Assembly Instructions descRIpTIon model # 12'W x 20'L x 10'H Run-In-Shed 51351 Recommended Tools Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored. THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE. Before you start: 2+ individual recommended for assembly, approximate time 3 hrs.
ATTenTIon: This shelter product is manufactured with quality materials. It is designed to fit the ShelterLogic custom fabric cover included. ® , LLC ShelterLogic Shelters offer storage and protection from damage caused by sun, light rain, tree sap, animal - bird excrement ®...
Page 4
BAsIc FRAme AssemBlY sTep 1 Fit together an end rib using the following parts (1) 10224 Bent Tube Swedged, (1) 10225 Bent Tube Plain and (2) 10226 Bent Corner Leg. Using (2) 10114 1/4" x 2" Carriage Bolts and (2) 01010 1/4" Nuts securely fasten the joints of the Corner Legs to the bends.
Page 5
NOTE: 15" Augers are for temporary use only! sTep 6 AncHoR sHelTeR For best results ShelterLogic recom- w/ AUGeR AncHoRs for mends using our Easy Hooks (#10036 dIRT sURFAces 4-pack, #10035 6-pack, or #10038 8-pack) or 30"...
Page 6
sTep 7 secURInG YoUR coveR Pull the cover over the frame. The welded in webbing should be at the front and back of the building. Also note that the pocket with the cutouts, running along the sides of the cover, should be on the inside and near the ground.
Need help?
Do you have a question about the 51351 and is the answer not in the manual?
Questions and answers