Commissioning - nVent SCHROFF LHX+ User Manual

Cooling cabinet
Table of Contents

Advertisement

3.4

Commissioning

The cabinet is completely wired and preconfigured. After connecting the power and water
supply, it can be put into operation.
Damage due to leaking water!
Fittings may have loosened due to transport or during installation.
Before commissioning, all fittings of the water circuit must be checked and tightened if
necessary.
The leaktightness must be checked during filling of the system.
Damage due to condensation and spraying water!
The cabinet doors must be closed for operation. If the cooling module is operated in an
open cabinet, condensation water will be produced around the heat exchanger, which is
distributed by the fans in the enclosure and can damage the electronics components.
The cabinet is equipped with door contact switches. When the doors are
open, the cooling module is shut off, the fans are disabled.
To ensure proper function and cooling performance, the front 19" plane must
be sealed off from the rear part of the cabinet by suitable air baffle plates and
seals.
ATTENTION
ATTENTION
Date: 2021/04/07
Page
: 16 of 47

Advertisement

Table of Contents
loading

This manual is also suitable for:

10130-32510130-32610130-327

Table of Contents