Ir Board - Epson EB-S01 Service Manual

Business/home projector
Hide thumbs Also See for EB-S01:
Table of Contents

Advertisement

EB-S01/W01/X14G/S11/X11/S02/S02H/X02/W02/S12/S12H/X12/W12/X14 EH-TW480

3.3.12.1 IR Board

Standard Operation Time
16 Min.
1.
Remove the Air Filter.
(p.59)
2.
Remove the Lamp.
(p.60)
3.
Remove the Upper Case (assembly).
4.
Remove the MA Board (assembly).
5.
Remove the Optical Engine.
(p.82)
6.
Remove the Lamp Fan.
(p.86)
7.
Remove the EX Duct (assembly).
8.
Remove the BA Power Supply (assembly).
9.
Remove the INT Duct (assembly).
10. Remove the INT Duct from the LV Duct.
11. Remove the IR Board from the LV Duct.
12. Remove the RC Cable from the IR Board.
SEIKO EPSON
(p.62)
(p.74)
(p.87)
(p.89)
(p.96)
Disassembly and Assembly
RC Cable
IR Board
97
INT Duct
LV Duct
C.B.P-TITE SCREW,2.5X6,F/ZN-3C
Figure 3-36.
CONFIDENTIAL
Revision C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents