JUKI PLC-2760NVM Instruction Manual page 28

Table of Contents

Advertisement

6)
Pull the 6-gang switch toward you. Place the thread clamp solenoid cord on the step part. Then, put the 6-gang
switch back into place and secure with the setscrews.
At this time, lightly pull the thread clamp solenoid cord to make sure that it can be moved.
If the cord cannot be moved, it may have been caught under the 6-gang switch. In such a case, remove the
6-gang switch and cord once and re-install them correctly.
8)
Remove the cable clip set-
screws. Pass the thread clamp
solenoid cord through the cable
clips and re-secure the cable
clips with the setscrews.
Bundle the cords with a cable
clip band (small).
Notch in the machine arm
9)
Bundle the cords with the
cable clip band (small).
7)
Route the cord to the right side while preventing it
from being caught under the tension disk floating
solenoid and pass it through the notch in the ma-
chine arm.
10) Connect the thread clamp so-
– 26 –
lenoid cord to the thread clamp
solenoid junction cable (asm.) and
route it as shown in the figure.
Bundle the excess length of the
thread clamp solenoid cord togeth-
er with a cable clip band (small).
Fit tge thread clamp solenoid junc-
tion cable (asm.) in the concave
portion of the machine arm.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Plc-2760nvma70bbz

Table of Contents