Grid connection
Generator connection
Wiring
Wiring box covers
Conduit
Wire protection

Basic Operations

Boot System

DANGER: Strictly follow the procedure to boot the system.
DANGER: Proceed to the following steps only after installation checklist is
completed.
Switch on the POWER switch on the BCMS module, press START button for 1
(1)
second and release. Wait approximately 60 seconds for the BCMS and Battery
Modules to initialize. All LED indicators on battery modules shall be solid
green and you will hear the beep of contactor closing.
Press the ON/OFF button on Universal PCS, and then wait approximately 60
(2)
seconds for the system to initialize.
Network indicator shall be solid red then blinking red. If it's already connected
(3)
to a router or extender via cable or Wi-Fi, the network indicator shall be
External breaker is installed.
The appropriate breaker is installed as specified.
The breaker is turned OFF.
N, L2, L1 are wired correctly.
Voltage is within the allowed range.
External breaker is installed.
The appropriate breaker is installed as specified.
The breaker is turned OFF.
N, L2, L1 are wired correctly.
Voltage is within the allowed range.
All cables are wired tightly.
All wiring covers are screwed tightly.
All conduits are tightly installed and sealed.
Insulated cover of wires is not at risk of being cut or
damaged.