Table of Contents

Advertisement

Quick Links

www.ti.com
User's Guide
TPS25762/72-Q1 EVM User's Guide
This document is the user's guide for TPS25762Q1EVM-146, TPS25772Q1EVM-149, and
TPS25772Q1EVM-150 Evaluation Modules. The EVMs allow for evaluation of the TPS25762-Q1 and
TPS25772-Q1 IC as part of a stand-alone testing kit and for development and testing of USB Type-C and Power
Delivery (PD) end products. This EVM board is designed for dual PD charging ports. According to different
components installation, it can support dual ports charging only (TPS25772Q1EVM-149), dual ports charging +
USB2.0 data (TPS25772Q1EVM-150), single port charging only (TPS25762Q1EVM-146) . This EVM integrates
the TIVA microcontroller and HUB IC, these enable us to support online debugging, online updating EEPROM
and support dual ports USB2.0 data. This EVM also integrates some peripherals to implement multiple function
of TPS25762/72-Q1, such as temperature sensor, IO expander, and digital potentiometer.
Number
1
TPS25762Q1EVM-146
2
TPS25772Q1EVM-149
3
TPS25772Q1EVM-150
Manual...................................................................................................................................................................3
3 Items Required for Operation................................................................................................................................................
4
Introduction.............................................................................................................................................................................3
5
Setup........................................................................................................................................................................................4
5.1 Switch, Push Button, Connector, and Test Points Descriptions ........................................................................................
Configuration.........................................................................................................................................................5
6
Schematics..............................................................................................................................................................................9
Schematic..................................................................................................................................................................9
6.2 Sub Schematic - Input Circuit..........................................................................................................................................
6.4 Sub Schematic - I2C Peripherals....................................................................................................................................
6.5 Sub Schematic - TPS55288-Q1......................................................................................................................................
6.6 Sub Schematic - HUB.....................................................................................................................................................
6.7 Sub Schematic - TIVA.....................................................................................................................................................
ESD......................................................................................................................................................17
7 Board Views and Layout Prints...........................................................................................................................................
8 Bill of Materials.....................................................................................................................................................................
Figure 5-1. J1 NTC Header.........................................................................................................................................................
Figure 5-2. J6 I2C MUX...............................................................................................................................................................
Connector...................................................................................................................................................6
Figure 5-4. TVSP Damper Network.............................................................................................................................................
Figure 5-7. J18/J19 GPIO9 Configuration...................................................................................................................................
Figure 5-8. J20 Enable Signal for TPS55288-Q1........................................................................................................................
Figure 6-1. TPS25762Q1EVM-146 Main Schematic...................................................................................................................
Figure 6-2. TPS25772Q1EVM-149 Main Schematic.................................................................................................................

Table 1-1. TPS25772/62-Q1 EVM Variants

EVM Variants

Table of Contents

Warnings..........................................................................................................................3
Power.....................................................................................................................................11
List of Figures
Aardvark...................................................................................................7
Connector.......................................................................................................................................7
Copyright © 2022 Texas Instruments Incorporated
ABSTRACT
Single port charging only
Dual ports charging only
Dual ports charing + USB2.0 Data
Table of Contents
Description
TPS25762/72-Q1 EVM User's Guide
3
4
11
12
13
14
16
18
23
5
5
6
8
8
9
10
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS25762Q1EVM-146 and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPS25762Q1EVM-146

  • Page 1: Table Of Contents

    (TPS25772Q1EVM-149), dual ports charging + USB2.0 data (TPS25772Q1EVM-150), single port charging only (TPS25762Q1EVM-146) . This EVM integrates the TIVA microcontroller and HUB IC, these enable us to support online debugging, online updating EEPROM and support dual ports USB2.0 data.
  • Page 2 Circuit................................11 Figure 6-5. Auxiliary Power................................ Figure 6-6. I C Peripherals................................ Figure 6-7. TPS55288-Q1 Circuit.............................. Figure 6-8. Single Port TPS55288-Q1 Circuit..........................13 Figure 6-9. TPS25762Q1EVM-146 and TPS25772Q1EVM-149 HUB Circuit................Figure 6-10. TPS25772Q1EVM-150 HUB Circuit........................15 Figure 6-11. TIVA Circuit................................16 Figure 6-12. ESD Circuit................................17 Figure 7-1.
  • Page 3: About This Manual

    Tool. Additionally, the EVM is equipped with Aardvark connector to I C interfaces, USB micro-B interface and USB2ANY interface for debugging and development. SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 4: Setup

    Test point for TIVA JTAG_SWD_SWO signals. J18/J19 Header to configure GPIO9. Choose enable signal for TPS55288-Q1. Other test points See marking on PCB board. TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 5: Jumper Configuration

    EEPROM. Since I C bus can support multiple slaves, it is recommended to connect all pins. Figure 5-2. J6 I2C MUX SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 6: Figure 5-3. J7 Tvsp Connector

    C from USB2ANY or Aardvark can be configured to connected to I C1, I C2, and I C3. Since I C bus can support multiple slaves, it is recommended to connect all pins. TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 7: Figure 5-5. Connectors And Mux For Usb2Any And

    GPIO9 as an interrupt I/O for I2C. J19 is the header used to configure GPIO9 as an enable signal or discharge signal for Port B. SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 8: Figure 5-7. J18/J19 Gpio9 Configuration

    J20 is the header to configure the enable signal of TPS55288-Q1. The default enable signal is the 3.3V LDO from TPS25772-Q1. It can be configured to GPIO9 or external enable signal as needed. Figure 5-8. J20 Enable Signal for TPS55288-Q1 TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 9: Schematics

    Schematics 6 Schematics This section shows the various EVM schematics of TPS25762Q1EVM-146, TPS25772Q1EVM-149, and TPS25772EVM-150. The whole schematic consists of one main schematic and seven sub schematics. 6.1 Main Schematic Figure 6-1 shows the main schematic of TPS25762EVM-146, Figure 6-2...
  • Page 10: Figure 6-2. Tps25772Q1Evm-149 Main Schematic

    PB_CC2 PB_CC2 PA_CC2 PA_CC2 PB_D_N TSW-110-07-G-D CONN_PB_D_N PB_D_N PA_D_N CONN_PA_D_N R138 I2C_SDA2 USB4085-GF-A USB4085-GF-A CONN_PB_D_P PB_D_P PA_D_P CONN_PA_D_P Figure 6-3. TPS25772Q1EVM-150 Main Schematic TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 11: Sub Schematic - Input Circuit

    6.2 Sub Schematic – Input Circuit This schematic is U_TPS25772Q1_A_Input sub-schematic of the main schematic. Figure 6-4 shows the input circuit. TPS25762Q1EVM-146, TPS25772Q1EVM-149, and TPS25772Q1EVM-150 have same input circuit. Reverse Curr ent, Reve rse Connect ion, a nd EMC fi lter NVMFS5C442NLT1G VBAT...
  • Page 12: Sub Schematic - I2C Peripherals

    6.4 Sub Schematic – I2C Peripherals This schematic is SS2 sub-schematic of the main schematic. Figure 6-6 shows the I C peripherals and connectors circuit. TPS25762Q1EVM-146, TPS25772Q1EVM-149 and TPS25772Q1EVM-150 have the same C peripherals circuit. I2C EEPROM Temper ature Sensor EGPIO2...
  • Page 13: Sub Schematic - Tps55288-Q1

    This schematic is SS3 sub-schematic of the main schematic. Figure 6-7 shows the TPS55288-Q1 circuit of TPS25772Q1EVM-149, and TPS25772Q1EVM-150. TPS55288-Q1 provides the power for port B. The components of this circuit is not installed on the single port TPS25762Q1EVM-146 as Figure 6-8 shows. TP27...
  • Page 14: Sub Schematic - Hub

    USB mux(U12). As Figure 6-9 shows, the DP/DM of Type-C connector are not connected to HUB, so there is no data connection from the USB micro-B connector(J16) to port A and port B on the TPS25762Q1EVM-146 and TPS25772Q1EVM-149. Figure 6-10 shows the HUB circuit of TPS25772Q1EVM-150.
  • Page 15: Figure 6-10. Tps25772Q1Evm-150 Hub Circuit

    4.7k 10.0k 4.7k 4.7k 4.7k VCC3V3 VCC1V1 0.1µF 0.1µF 0.1µF 0.1µF 0.1µF 0.1µF 0.1µF 0.1µF 0.1µF 0.1µF 0.1µF Figure 6-10. TPS25772Q1EVM-150 HUB Circuit SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 16: Sub Schematic - Tiva

    Schematics www.ti.com 6.7 Sub Schematic – TIVA This schematic is SS5 sub-schematic of the main schematic. Figure 6-11 shows the TIVA circuit. TPS25762Q1EVM-146, TPS25772Q1EVM-149, and TPS25772Q1EVM-150 have the same TIVA circuit. VCC3V3 R132 10.0k 10.0k 15.0k 0.1µF 0.1µF 0.1µF 0.1µF...
  • Page 17: Sub Schematic - Esd

    Schematics 6.8 Sub Schematic – ESD This schematic is SS7 sub-schematic of the main schematic. Figure 6-12 shows the ESD circuit, TPS25762Q1EVM-146, TPS25772Q1EVM-149, and TPS25772Q1EVM-150 have the same ESD circuit. PA_CC1 PB_CC1 TPD1E05U06QDPYRQ1 TPD1E05U06QDPYRQ1 PA_CC2 PB_CC2 TPD1E05U06QDPYRQ1 TPD1E05U06QDPYRQ1 C108...
  • Page 18: Board Views And Layout Prints

    7-3, Figure 7-4 show the PCB layouts of the EVM. Figure 7-5 Figure 7-6 show the 3D top and bottom view for TPS25762Q1EVM-146, Figure 7-7 Figure 7-8 show the 3D top and bottom view for TPS25772Q1EVM-149, Figure 7-9 Figure 7-10 show the 3D top and bottom view for TPS25772Q1EVM-150.
  • Page 19: Figure 7-3. Middle Layer2

    Board Views and Layout Prints Figure 7-3. Middle Layer2 Figure 7-4. Bottom Layer SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 20: Figure 7-5. Tps25762Q1Evm-146 3D Top View

    Board Views and Layout Prints www.ti.com Figure 7-5. TPS25762Q1EVM-146 3D Top View Figure 7-6. TPS25762Q1EVM-146 3D Bottom View TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 21: Figure 7-7. Tps25772Q1Evm-149 3D Top View

    Board Views and Layout Prints Figure 7-7. TPS25772Q1EVM-149 3D Top View Figure 7-8. TPS25772Q1EVM-149 3D Bottom View SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 22: Figure 7-9. Tps25772Q1Evm-150 3D Top View

    Board Views and Layout Prints www.ti.com Figure 7-9. TPS25772Q1EVM-150 3D Top View Figure 7-10. TPS25772Q1EVM-150 3D Bottom View TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 23: Bill Of Materials

    GCM188R71H103KA37D MuRata 0603 CAP, CERM, 0.1 µF, 50 V,+/- 10%, C29, C31, C33, C34, C35 0.1uF 0603 06035C104KAZ2A X7R, AEC-Q200 Grade 1, 0603 SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 24 Bill of Materials www.ti.com Table 8-1. TPS25762Q1EVM-146 BOM (continued) Designator Quantity Value Description Package Reference Part Number Manufacturer CAP, CERM, 4.7 uF, 35 V, +/- 10%, C37, C38 4.7uF 0805 CGA4J1X7R1V475K125AC X7R, AEC-Q200 Grade 1, 0805 CAP, CERM, 0.22 µF, 50 V,+/- 0.22uF...
  • Page 25 Bill of Materials Table 8-1. TPS25762Q1EVM-146 BOM (continued) Designator Quantity Value Description Package Reference Part Number Manufacturer Header, 2.54mm, 3x1, Tin, TH Header, 2.54mm, 3x1, TH 68001-403HLF Header, 100mil, 10x2, Gold, TH 10x2 Header TSW-110-07-G-D Samtec Header, 100mil, 2x2, Tin, TH Header, 2x2, 2.54mm, TH...
  • Page 26 Bill of Materials www.ti.com Table 8-1. TPS25762Q1EVM-146 BOM (continued) Designator Quantity Value Description Package Reference Part Number Manufacturer MOSFET, N-CH, 40 V, 27 A, AEC- DFN5 5x6mm NVMFS5C442NLT1G ON Semiconductor Q101, DFN5 5x6mm RES, 2.2, 5%, 0.125 W, AEC- R3, R4...
  • Page 27 Bill of Materials Table 8-1. TPS25762Q1EVM-146 BOM (continued) Designator Quantity Value Description Package Reference Part Number Manufacturer 6.65k RES, 6.65 k, 1%, 0.063 W, 0402 0402 CRCW04026K65FKED Vishay-Dale RES, 2.20 k, 1%, 0.063 W, AEC- R47, R48, R49, R50, R51, R52 2.20k...
  • Page 28 Bill of Materials www.ti.com Table 8-1. TPS25762Q1EVM-146 BOM (continued) Designator Quantity Value Description Package Reference Part Number Manufacturer SH-J1, SH-J2, SH-J3, SH-J4, SH- J5, SH-J6, SH-J7, SH-J8, SH-J9, Shunt, 100mil, Gold plated, Black Shunt SNT-100-BK-G Samtec SH-J10, SH-J11, SH-J12, SH-J13,...
  • Page 29 Bill of Materials Table 8-1. TPS25762Q1EVM-146 BOM (continued) Designator Quantity Value Description Package Reference Part Number Manufacturer Automotive 3.8-V to 36-V 2-A Synchronous Step-Down Voltage RNX0012B LMR33620CQ5RNXTQ1 Texas Instruments Regulator, RNX0012B (VQFN- HR-12) 1-A LDO With Power-Good, U8, U9...
  • Page 30: Table 8-2. Tps25772Q1Evm-149 Bom

    0805 CGA4J1X7R1V475K125AC X7R, AEC-Q200 Grade 1, 0805 CAP, CERM, 0.22 µF, 50 V,+/- 0.22uF 10%, X7R, AEC-Q200 Grade 1, 0603 GCJ188R71H224KA01D MuRata 0603 TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 31 CAP, CERM, 0.1 µF, 16 V,+/- 5%, C87, C88, C89, C90, C91, C92, 0.1uF 0402 GCM155R71C104JA55D MuRata X7R, AEC-Q200 Grade 1, 0402 C93, C94, C95, C97, C99, C106 SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 32 Header, 2.54mm, 2x1, TH TSW-102-08-G-S Samtec Inductor, Shielded, Composite, 4.7 L1, L10 4.7uH Inductor, 11.3x10x10mm XAL1010-472MEB Coilcraft uH, 24 A, 0.01 ohm, SMD TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 33 Q200 Grade 0, 0402 RES, 100 k, 1%, 0.0625 W, AEC- R25, R29, R30, R54, R79, R130 100k 0402 AC0402FR-07100KL Yageo America Q200 Grade 0, 0402 SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 34 R69, R71 1.00 0603 CRCW06031R00FKEA Vishay-Dale Grade 0, 0603 RES, 1.00, 1%, 0.063 W, AEC- 1.00 0402 CRCW04021R00FKED Vishay-Dale Q200 Grade 0, 0402 TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 35 RES, 10.2 k, 1%, 0.1 W, 0603 0603 RC0603FR-0710K2L Yageo Thermistor, DEC0002A (X1SON-2) DEC0002A TMP6131DECR Texas Instruments Switch, SPST-NO, Off-Mom, 0.01 4.2x2.8mm KMR243GLFG C&K Components A, 32 VDC, SMD SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 36 Potentiometer With I2C Interface RUC0014A TPL0102-100RUCR Texas Instruments and Nonvolatile Memory, RUC0014A (X2QFN-14) Low Iq Always ON Smart Diode DBV0006A LM74700QDBVRQ1 Texas Instruments Controller, DBV0006A (SOT-23-6) TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 37 LQFP (PM), Green (RoHS & no Sb/Br), Tape and Reel Crystal, 24 MHz, 30 ppm, 20 pF, 5x3.2mm ECS-240-20-30B-AEN-TR ECS Inc. Crystal, 16 MHz, 8pF, SMD 3.2x0.75x2.5mm NX3225GA-16.000M-STD-CRG-1 SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 38: Table 8-3. Tps25772Q1Evm-150 Bom

    0805 CGA4J1X7R1V475K125AC X7R, AEC-Q200 Grade 1, 0805 CAP, CERM, 0.22 µF, 50 V,+/- 0.22uF 10%, X7R, AEC-Q200 Grade 1, 0603 GCJ188R71H224KA01D MuRata 0603 TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 39 CAP, CERM, 0.1 µF, 16 V,+/- 5%, C87, C88, C89, C90, C91, C92, 0.1uF 0402 GCM155R71C104JA55D MuRata X7R, AEC-Q200 Grade 1, 0402 C93, C94, C95, C97, C99, C106 SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 40 Header, 2.54mm, 2x1, TH TSW-102-08-G-S Samtec Inductor, Shielded, Composite, 4.7 L1, L10 4.7uH Inductor, 11.3x10x10mm XAL1010-472MEB Coilcraft uH, 24 A, 0.01 ohm, SMD TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 41 Q200 Grade 0, 0402 RES, 100 k, 1%, 0.0625 W, AEC- R25, R29, R30, R54, R79, R130 100k 0402 AC0402FR-07100KL Yageo America Q200 Grade 0, 0402 SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 42 R69, R71 1.00 0603 CRCW06031R00FKEA Vishay-Dale Grade 0, 0603 RES, 1.00, 1%, 0.063 W, AEC- 1.00 0402 CRCW04021R00FKED Vishay-Dale Q200 Grade 0, 0402 TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 43 RES, 10.2 k, 1%, 0.1 W, 0603 0603 RC0603FR-0710K2L Yageo Thermistor, DEC0002A (X1SON-2) DEC0002A TMP6131DECR Texas Instruments Switch, SPST-NO, Off-Mom, 0.01 4.2x2.8mm KMR243GLFG C&K Components A, 32 VDC, SMD SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 44 Potentiometer With I2C Interface RUC0014A TPL0102-100RUCR Texas Instruments and Nonvolatile Memory, RUC0014A (X2QFN-14) Low Iq Always ON Smart Diode DBV0006A LM74700QDBVRQ1 Texas Instruments Controller, DBV0006A (SOT-23-6) TPS25762/72-Q1 EVM User's Guide SLVUC03 – NOVEMBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 45 LQFP (PM), Green (RoHS & no Sb/Br), Tape and Reel Crystal, 24 MHz, 30 ppm, 20 pF, 5x3.2mm ECS-240-20-30B-AEN-TR ECS Inc. Crystal, 16 MHz, 8pF, SMD 3.2x0.75x2.5mm NX3225GA-16.000M-STD-CRG-1 SLVUC03 – NOVEMBER 2022 TPS25762/72-Q1 EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 46 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 47 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 48 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 49 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 50 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 51 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2022, Texas Instruments Incorporated...

This manual is also suitable for:

Tps25772q1evm-149Tps25772q1evm-150

Table of Contents