Ductwork - Panasonic FV-10VEC2R Installation And Operating Instructions Manual

Energy recovery ventilator
Hide thumbs Also See for FV-10VEC2R:
Table of Contents

Advertisement

INSTALLATION
Unit: inches (mm)
3.Hang ERV on to wall bracket.
CAUTION
Make sure the power cord is upward.
(Fig.4)
4.Mount L plate on to stud with long screws
(ST4.2X20). (Fig.5)
5.Install plug covers into plugs on frame
cover. (Fig.6)

DUCTWORK

1.Install ducts according to one of three methods as shown below.
- Simplified ducted installation (Return method)
Method
This method draws return air from the return air duct
of the air furnace and supplies an equal amount of
outside air farther downstream into the return duct.
(Fig.7 & Fig.8)
Note
(1)The ERV unit must be balanced.
(2)It is mandatory that HVAC/AHU signal cord be
connected.
(3)Check local codes and authority having
jurisdiction for acceptance.
(WALL MOUNT)
24 (609.6)
19 (482.6)
16 (406.4)
Power cord
2-long screws
(ST4.2x20)
4-plug covers
Wall bracket
Fig.4
Fig.5
Fig.6
Fig.7
9