Installation (Wall Mount) - Panasonic FV-10VEC2R Installation And Operating Instructions Manual

Energy recovery ventilator
Hide thumbs Also See for FV-10VEC2R:
Table of Contents

Advertisement

INSTALLATION
This method can be used in stud as below.
A
B
Stud
1.Mount wall bracket on stud with long screws
(ST4.2x20). (Fig.2)
Note
(1)Attach with flanged edge facing outward
and edge without flange facing upward
when mounting wall bracket. (Fig.2)
(2)Choose the mounting hole on wall
bracket according to the distance
between studs.
Unit: inches (mm)
16 (406.4)
19 (482.6)
24 (609.6)
2.Mount hanger
with screws (M4X8) and mount L plate on the
two side of frame body with screws (M4X8).
(Fig.3)
Note
(1)When mount hanger , please attach with
the claw facing downward to frame body
that the side with power cord facing
upward.
(2)Choose the mounting hole according to
the distance between studs.
8
(WALL MOUNT)
Unit: inches (mm)
A
16 (406.4)
14 1/2 (368.3)
19 (482.6) 17 1/2 (444.5)
24 (609.6)
22 1/2 (571.5)
on the back of frame body
Wall
bracket
B
Power cord
Unit: inches (mm)
Edge without
flange
4-long screws
(ST4.2x20)
Stud
Floor
2-screws (M4X8)
Hanger
Claw
4-screws
(M4X8)
Flange
Fig.2
L plate
Fig.3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents