Servicing And Maintenance Logs - Buderus Logano G115/3 WS Installation And Service Instructions Manual

Low-temperature oil boiler
Hide thumbs Also See for Logano G115/3 WS:
Table of Contents

Advertisement

8
Heating system servicing
8.6

Servicing and maintenance logs

▶ Initial and date the servicing operations completed.
1.
Check general condition of heating system
2.
Visual inspection and function check of the heating system
3.
Checking fuel and water-carrying components of the system for:
•visible signs of corrosion
4.
Check the combustion chamber and the heating surface for
contamination; shut down the system for this step
5.
Checking the burner ( burner documentation)
6.
Check the combustion air supply and flue gas routing for function and
7.
Check the operating pressure, relief valve and expansion tank inlet
8.
Checking function of DHW tank and sacrificial anode ( DHW tank
9.
Checking controls settings ( controls' documentation)
10.
Record the final checks of the inspection work, incl. measurements
Confirmation of properly completed servicing
38
Service work
•leaks during operation
•leak test
•signs of ageing
safety
pressure
documentation)
and test results
The inspection and servicing logs can also be used as copy masters.
Page
Date:______
34
37
Company stamp/
Company stamp/
signature
Logano G115 WS US/CA – 6 720 813 418 (2019/09)
Date:______
Date:______
Company stamp/
signature
signature

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents