Environmental Instruction; Packing; Boiler Plant Decommissioning; Operating Principle - Jaspi PELLETTI XL Installation And Operation Manual

Table of Contents

Advertisement

Environmental Instruction

Packing

Boiler Plant Decommissioning

Operating Principle

PELLETTI XL boiler is designed first of all
for pellet burning. While choosing pellet boil-
ers it is necessary to clear up necessity in free
space, pellet storage and frequency of boiler
cleaning. Installation shall always be per-
formed

Technical Data

Power range:
Weight:
Water capacity:
Max. temperature:
Min. temperature:
Max. pressure:
Proof-test pressure:
15...30 kW
450 kg
220 L
110 ºC
0 ºC
1.5 bar
4.0 bar
Pelletti XL
3
Packing is made of 100 % waste materials.
Dispose of packing in accordance with local
waste disposal requirements.
The boiler shall be delivered to metal scrap
receiving points and electric components - to
receiving points of electric and electronic
components.
by qualified personnel knowing requirements
of official control authorities.
It is recommended to use energy accumula-
tors in combination with pellet burner as it
increases operating cycle, improves operating
level and reduces emissions.
Max. total capacity:
Voltage:
Frequency:
Protection class:
Furnace dimensions:
6.2 kW
230 V
50 Hz
IP 2X
height 750 mm
width 290 mm
depth 380 mm

Advertisement

Table of Contents
loading

Table of Contents