Table Of Contents; Burner Description; Burner Equipment; Burner Equipment Flange With Insulating Gasket - Riello Burners RDB1 70-90 Installation, Use And Maintenance Instructions

Table of Contents

Advertisement

INDEX
1.
BURNER DESCRIPTION . . . . . . . . . . . .
1.1 Burner equipment. . . . . . . . . . . . . . . . . .
2.
TECHNICAL DATA . . . . . . . . . . . . . . . .
2.1 Technical data . . . . . . . . . . . . . . . . . . . .
2.2 Overall dimensions. . . . . . . . . . . . . . . . .
2.3 Firing rates . . . . . . . . . . . . . . . . . . . . . .
3.
INSTALLATION . . . . . . . . . . . . . . . . . . .
3.1 Boiler fixing . . . . . . . . . . . . . . . . . . . . . .
3.2 Burner assembly . . . . . . . . . . . . . . . . . .
3.3 Hydraulic systems . . . . . . . . . . . . . . . . .
3.4 Electrical wiring . . . . . . . . . . . . . . . . . . .
1.

BURNER DESCRIPTION

One stage kerosene and light oil burner.
In case of BF applications the intake air temperature must not be over 70°C.
CE Certification No.: 0036 0326/01 (483T50) - 0036 0316/01 (501T2K), as 92/42/EEC.
The burner meets protection level of IP 40, EN 60529.
Burner with CE marking in conformity with EEC directives: EMC 89/336/EEC, Low Voltage 73/23/EEC,
Machines 98/37/EEC and Efficiency 92/42/EEC.
3
8
1 - Pump
3 - Reset button with lock-out lamp
4 - Flange with insulating gasket
Screw and nuts for flange . . . . . . . . No. 1
Hexagonal key . . . . . . . . . . . . . . . . . No. 1
Flexible oil pipe with nipple . . . . . . . No. 1
2458
1
4.
1
4.1 Combustion adjustment. . . . . . . . . . . . . .
4.2 Nozzles recommended . . . . . . . . . . . . . .
2
4.3 Electrodes setting . . . . . . . . . . . . . . . . .
2
4.4 Pump pressure . . . . . . . . . . . . . . . . . . . .
2
4.5 Air damper adjustment . . . . . . . . . . . . . .
2
4.6 Burner start-up cycle . . . . . . . . . . . . . . . .
3
5.
3
3
6.
5
6
Fig. 1
5
4
D6115
5 - Air damper adjustment screw
6 - Pump pressure adjustment screw
7 - Pressure gauge port
8 - Photoresistance
Screw of by-pass pump . . . . . . . . . . . . . . . . . . . No. 1
Nuts for flange to be fixed to boiler . . . . . . . . . . . No. 2
1
WORKING . . . . . . . . . . . . . . . . . . . . . . .
MAINTENANCE . . . . . . . . . . . . . . . . . . .
FAULTS / SOLUTIONS. . . . . . . . . . . . . .
1
7
7
7
7
7
7
8
8
9
2
6
7

Advertisement

Table of Contents
loading

Table of Contents